|
| 1 | RPWS Scheme to ManikeswarDesign,Supply, Installation, Testing & Commissioning of Packaged Treatment Plant (Unconventional Type) of different Capacity with 16 hrs operation comprising of Lamella Clarifier, Static Mixture Flocculation Tank, (SMFT) Multi Grade Filter (MGF) with best quality filter media, Lime/ Coagulant/ Polymer Dosing System, Hypo Chloride Dosing System, Raw Water Feed Pump/ Clear Water Transfer Pump (Either/or) Sludge Tranfer-cum- Recirculation system, Filter Feed Pump and Back wash Pump including all fittings like Valves and other special fittings and Electrical Power Supply to the different supplied units with MCB Pannel, internal Electrifications with lighting arrangements within Treatment Plant Site with provision of Chemical Storage and Water Testing Laboratory facility should be from a reputed Manufacturer/ Authorized Distributor/ Authorized Dealer confirming to relevant IS Codes and certified by ISO - 9001-2008 and 14001. It also includes cost of Civil Foundation, Interim Clarified Water Tank, inter-connecting Pipe Lines from Raw Water Inlet to CWR and applying internal epoxy paint on the supplied equipments0.20 Mld Capacity |
| 2 | Designing, Testing and commissioning of R.C.C Under Ground Clear Water Reservoir of 50000 Ltr Capacity with suplying fitting, fixing of all materials, labour with fitting and fixing of sluice valves, Puddle collar, M.S / Aluminium stair , M.H cover,Jally as per specification etc. including testing, commissioning and clearance of site as per instruction Engineer-in-Charge. N.B-The tenderer will have to submit detailed drawing, design and soil testing report from competent Government approved authority for the UGR after making Agreement with the Superintending Engineer, RWS&S Division, Phulbani before execution of the work. |
| 3 | Supplying all materials, Labour, T&P and providing Pumping arrangement from CWR to Rising Main including supply of all valves, Pumps, Panel Boards, Cable etc and connecting to existing rising main complete. |
| 4 | Operation and Maintenance for 5 Years on Item No: 1 @ 5% of Basic Cost / Year. |
| 5 | RPWS Scheme to GumamahaDesign,Supply, Installation, Testing & Commissioning of Packaged Treatment Plant (Unconventional Type) of different Capacity with 16 hrs operation comprising of Lamella Clarifier, Static Mixture Flocculation Tank, (SMFT) Multi Grade Filter (MGF) with best quality filter media, Lime/ Coagulant/ Polymer Dosing System, Hypo Chloride Dosing System, Raw Water Feed Pump/ Clear Water Transfer Pump (Either/or) Sludge Tranfer-cum- Recirculation system, Filter Feed Pump and Back wash Pump including all fittings like Valves and other special fittings and Electrical Power Supply to the different supplied units with MCB Pannel, internal Electrifications with lighting arrangements within Treatment Plant Site with provision of Chemical Storage and Water Testing Laboratory facility should be from a reputed Manufacturer/ Authorized Distributor/ Authorized Dealer confirming to relevant IS Codes and certified by ISO - 9001-2008 and 14001. It also includes cost of Civil Foundation, Interim Clarified Water Tank, inter-connecting Pipe Lines from Raw Water Inlet to CWR and applying internal epoxy paint on the supplied equipments0.20 Mld Capacity |
| 6 | Designing, Testing and commissioning of R.C.C Under Ground Clear Water Reservoir of 50000 Ltr Capacity with suplying fitting, fixing of all materials, labour with fitting and fixing of sluice valves, Puddle collar, M.S / Aluminium stair , M.H cover,Jally as per specification etc. including testing, commissioning and clearance of site as per instruction Engineer-in-Charge. N.B-The tenderer will have to submit detailed drawing, design and soil testing report from competent Government approved authority for the UGR after making Agreement with the Superintending Engineer, RWS&S Division, Phulbani before execution of the work. |
| 7 | Supplying all materials, Labour, T&P and providing Pumping arrangement from CWR to Rising Main including supply of all valves, Pumps, Panel Boards, Cable etc and connecting to existing rising main complete. |
| 8 | Operation and Maintenance for 5 Years on Item No: 1 @ 5% of Basic Cost / Year. Please Enable Macros to View BoQ information |