|
| 1 | (WBSR-I Page - 1,It.No.- 2) Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1.500 mm. |
| 2 | (WBSR-I Page - 259, It.No.- 1) Supplying and stacking of good earth (adequate for horticulture work) at site including royalty (earth measured in stack will be reduced by 20% for payment). |
| 3 | (WBSR-I Page - 259,It.No.- 2)Supplying and stacking sludge (adequate for Horticulture work) at site in dry cake form from approved disposal work site including royalty, all lead and lift etc. (Sludge measured in stack will be reduced by 8%). |
| 4 | (WBSR-I Page - 259,It.No.- 3) Spreading of sludge, dump manure/ farm yard manure/animel dung manure and good earth in required thickness. This includes supply of labour, tools & plants excluding materials. |
| 5 | (WBSR-I Page - 259, It.No.-4)Supplying and fixing grasses tiles of grass Maxican Carpet/ Selection No. 1 Healthy & fresh grasses (size 1'x1' or bigger) including watering and maintenance of the lawn for30 days or more till the grass forms a thick lawn free from wees and fit for mowing including supplying good earth as required by Engineer-in-charge. (Rate includes supply of labour, tools & plants including materials) |
| 6 | ( WBSR-I Page -260, It.No.- 5)Preparation of beds for hedging and shrubbery by excavating 60cm deep and trenching the excavated base to a further depth of 30cm, refilling the excavated earth afterbreaking clods and mixing with sludge or manure in the ratio of 8:1 ( 8 parts of stacked volume of earth after reduction by 20%, one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary watering and finally fine dressing, levelling etc., including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50m lift upto 1.5m complete. This includes supply of labour, tools & plants including materials. Planting hedge plants in two rows at 30 cm apart |
| 7 | ( WBSR-I Page -261, It.No.- 9),Supplying and Planting of different plant / trees (Supplying well grown plants bushy and healthy, minimum height asspecified i.e. exposed height including all leads & lift,carriage, handling, manuring, applying presticide and fertilizer etc. i) Furcaria veriegated 10-12 leaves in height 20-30cm in earthen pots of size 25cm. |
| 8 | ii) Rangon chineese of size not less than 20cm |
| 9 | iii) Rangon chineese polythene pack over boundary wall front |
| 10 | iv) Rangon hi-breed healthy plant. over boundary wall front |
| 11 | v) Duranta goldianna of size not less than 20cm over boundary wall front |
| 12 | vi) Duranta healthy plant of big size over boundary wall front |
| 13 | xxii) Croton different varieties of height 30 cm to 90 cm in earthen pots of size 20 cm. |
| 14 | xxiii) Hibiscus Rosa Sinensis of height 90 cm to 60 cm in earthen pots of size 20 cm. Please Enable Macros to View BoQ information |