| 1 | Providing and laying 40mm dia HDPE/PVC Black pipe. As NS item @ 23/- |
| 2 | Providing and fixing 1.5 sqmm cable |
| 3 | Repair of Existing Street Light Pole with welding and raising of height with 03 Feet as per NS item @ 1000/- LS |
| 4 | Street light 50 watt |
| 5 | [11.68.3]Applying priming coat: 3. With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works |
| 6 | [11.82.1]Painting the wooden / metal surface with synthetic enamel paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work |
| 7 | [23.22.5.4]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.4. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 40 amp to 63 amp. Double pole |
| 8 | [24.13.16]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE LOOSE IN EXISTING PIPE OR TRENCHES COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 16. 10 Sq mm 3 core (Arm.) |
| 9 | [24.2.3.3]LT CABLE 3.3. Laying of underground cable 0.75 metre below ground level covered without sand and bricks including excavation and refilling of trenches.:- 50 Sq mm to 150 sqmm 2 to 4 Core |
| 10 | [24.4.2.2]STREET LIGHT 2.2. Supply and erection of GI bracket made of 32 mm dia medium class GI pipe, having 15 deg angle from horizontal, suitable for fixing on top of Street Light pole 90 cm long, with 20 cm high suitable size pole cap |
| 11 | [24.4.4.1]STREET LIGHT 4.1. Erection of street light fitting on the pole including the cost of petty material required (irrespective of height/length of bracket) At Pole up to the height of 4.5 metres |
| 12 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil |
| 13 | [6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) |
| 14 | [6.29.3]Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts Please Enable Macros to View BoQ information |