| 1 | Sewage Treatment Plant: Design, Construction, Supply, Erection, Testing, Commissioning of 30 MLD average flow with peak factor Main Pumping Station of 67.5 MLD (MPS) and 30 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology with Tertiary Treatment complete in all respect including Landscaping, all other contingent i.e. Civil, Electrical, Mechanical, Piping and Instrumentation work with PLC and SCADA arrangement for STP integrated with MPS at STP including Tertiary treatment, Entire infrastructure including construction of Staff quarter, Administrative building cum Laboratory with equipment and tools, and plants as per detailgiven in the bid document comprises of 1800 mm dia incoming sewer lines to be connected with last Manhole prior to MPS, Main Receiving Chamber, By Pass Channel, Inlet Chamber, Coarse Screen Chamber, Distribution Chamber, wet well sump suitable for 30 MLD average flow with peak factor including Providing and installing non clog sewage submersible pump sets each equipped with VFD and suitable LT panel boards, all safety devices, automatic capacitor bank and suitable size submersible cable from LT panel to pumps, K9 DI pipe of suitable dia at MPS including welding and screwing of flanges, ISI marked D.I. fittings, Knife gate valves, non-return valves as per requirements even for bye-pass arrangements along with necessary Knife gate valves etc., Piping Gallery, Stilling Chamber, Fine Screen Chamber, Grit Chamber, SBR Basin, Sludge Thicker, Necessary piping work with the required DI D/F Resilient seated Sluice Valve and sluice Valve Chambers, Belt Filter Press including Belt Filter Press feed pump, Chlorine Contact Tank, Chlorinator room, Pressure Sand Filter and Activated Carbon filters, Providingand laying of RCC pipe cater 30 MLD flow with peak factor as per CPHEEO manual from plant outlet to disposal point (Existing Nalla, named as Drain no. 6) for Disposal of Treated effluent of 30.0 MLD, complete in all respects as per complete scope of work mentioned in Annexure-I including 6 Years Defect Liability-cum-Maintenance Period (after 3 Months trial run) at Rathdhana, Sonipat town: (a) Entire Civil works, mechanical, electric and instrumentation works as per DNIT (As per detail attached at annexure– AIand inclusive of O and M).Detail of components are attached as annexure A1Unit: 01 JobBrake up of cost for payment plan: -Capital work 80%DLP-cum-maintenance period20% Scheduled of payment for DLP-cum-maintenance periodis attached with DNITO and M includes all the scope of work included in the DNITPayment scheduled is attached as annexure A2 |