| 1 | Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.) |
| 2 | Pcc Pole 8.5/9 Mtr. Long |
| 3 | STP Pole 9/11/13 Mtr. Long |
| 4 | Teeoff Channel with N&B |
| 5 | Earthing set complete |
| 6 | V type X arm |
| 7 | Pin Insulator with Pin |
| 8 | Disc Insulator with fitting |
| 9 | LT XLPE/PVC Cable |
| 10 | AB Cable |
| 11 | ACSR Dog Conductor |
| 12 | XLPE Cable |
| 13 | Cable Jointing Kit |
| 14 | Guarding Angle |
| 15 | G.I Wire |
| 16 | MS Dropper Channel |
| 17 | Ms Top Channel |
| 18 | Stay set Complete |
| 19 | 250 KVA 11/0.4 KV T/F |
| 20 | Distribution Box |
| 21 | F Bracket |
| 22 | Fuse Set |
| 23 | Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 24 | Pcc Pole 8.5/9 Mtr. Long |
| 25 | STP Pole 9/11/13 Mtr. Long |
| 26 | Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work |
| 27 | Teeoff Channel with N&B |
| 28 | Pin Insulator with Pin |
| 29 | Disc Insulator with fitting |
| 30 | V type X arm |
| 31 | MS Dropper Channel |
| 32 | Ms Top Channel |
| 33 | Ms Angle T/F Base |
| 34 | Fuse Set |
| 35 | Cable Jointing Kit |
| 36 | Distribution Box |
| 37 | F Bracket |
| 38 | Installation of 250 kva T/F in proper alignment direction & making HT/LT connection. |
| 39 | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 40 | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. |
| 41 | Laying, sagging and stringing and jumpering/binding etc. in 33 KV/11 KV / LT lines as per RESPO manual and as per direction of supervising engineer. |
| 42 | LT XLPE/PVC Cable |
| 43 | AB Cable |
| 44 | 11 kv XLPE Cable |
| 45 | ACSR Dog Conductor |
| 46 | Providing & Fixing of AL Lug |
| 47 | Providing & Fixing of ACSR Weasel Conductor |
| 48 | Providing & Fixing of Copper L Piece |
| 49 | Providing & Fixing of Eye & J Hook |
| 50 | Providing & Fixing of Barbed Wire |
| 51 | Providing & Fixing of Red Oxide Paint |
| 52 | Providing & Fixing of Aluminium Paint |
| 53 | Providing & Fixing of PG Clamp |
| 54 | Providing & Fixing of Suspension Clamp |
| 55 | Providing & Fixing of Dead End Clamp |
| 56 | Providing & Fixing of Pearcing Connector |
| 57 | Providing & Fixing of Nut,Bolt & washer |
| 58 | Providing & Fixing of Danger Board |
| 59 | Providing & Fixing of LT Tailless Unit |
| 60 | Providing & Fixing of Different Type of Clamp |
| 61 | Plinth of Round Pole |
| 62 | Re Guarding / Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. |
| 63 | Construction of plinth of size 2*2*1.5 mtr above ground level one ft below the ground level of 9\\" After Exavation of 4 \\"earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9\\"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6\\"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. |
| 64 | Earthing of 250 KVA medium Power Transformers |
| 65 | Net Fencing of 250 KVA medium Power Transformers Please Enable Macros to View BoQ information |