|
| 1 | CARTAGE OF STORE ITEMS FROM ESC RBL TO DUMP SITE AND DUMP SITE TO WORK SITE ALONG WITH LOADING UNLOADING AND PROPER STACKING |
| 2 | LOOSE LINE MATERIAL ABC 3X50 AND ACSR CONDUCTOR INCLUDING 11 KV PIN INSULATOR WITH PIN 11 KV DISC FITTING 45 KN, 11 KV INSULATOR 45 KN, TOP CHHANEL, MS T-OFF CHANEL, STAY COMPLETE, S/S BASE ANGAL, GI WIRE, MS DROPER ANGAL, STAY COMPLETE, 11 KV PTMO, DISTRIBUTION BOX Etc |
| 3 | PCC POLE 8.5 METER LONG |
| 4 | ACSR WEASEL CONDUCTOR |
| 5 | 11 KV POLYMIRIC PIN INSULATOR |
| 6 | 11 KV POLYMIRIC DISC INSULATOR 45 KN |
| 7 | 11 KV DISC FITTING 45 KN |
| 8 | 11/0.4 KV T/F 63 KV |
| 9 | 11/0.4 KV T/F 25 KV |
| 10 | EARTHING COMPLETE |
| 11 | STAY COMPLETE |
| 12 | ABC (3X50+1X35+1X16 SQMM) |
| 13 | MS TOP CHANNEL 125X65X2240 MM |
| 14 | MS TOP CHANNEL (DROPPER) 100X50X2028 MM FOR FUSE SET |
| 15 | MS SUB STATION ANGLE |
| 16 | DISTRIBUTION BOX 3 PHASE |
| 17 | CROSS ARM |
| 18 | GI WIRE |
| 19 | 3.5X50 SQM ALUMINIUM ARMOURED CABLE |
| 20 | ERRECTION |
| 21 | Errection of 8.5 Mtr long PCC Pole On D/P including digging of Pits & fitting of accessories. |
| 22 | Errection of 8.5 Mtr long PCC Pole including digging of Pits & fitting of accessories. |
| 23 | Stringing of ABC (3X50+1X35+1X16) Sqmm as per RESSPO Norms. |
| 24 | Stringing of ACSR Conductor as per RESSPO Norms. |
| 25 | Digging of pits, fixing nozzling & grouting of stay rods as per RESSPO norms including grouting materials. |
| 26 | Grouting of Poles as per RESSPO norms with grouting materials as per RESSPO Norms. |
| 27 | Mounting Of New 63 KVA T/F on DP as per RESSPO Norms. |
| 28 | Mounting Of New 25 KVA T/F on DP as per RESSPO Norms. |
| 29 | Earthing of Poles & T/F as per RESSPO Norms. |
| 30 | Installation 11 KV Fuse set as per RESSPO norms. |
| 31 | PROVIDED BY CONTRACTOR |
| 32 | 11 KV FUSE SET |
| 33 | NUT & BOLT |
| 34 | HOLDING CLAMP WITH NUT & BOLT |
| 35 | LT CLAMP FOR B&N |
| 36 | B&N FOR SACKLE INSULTOR |
| 37 | DENGER BORD |
| 38 | LUG SUITABLE FOR T/F |
| 39 | PG CLAMP |
| 40 | STAY INSULATOR |
| 41 | BARBED WIRE |
| 42 | CARTAGE OF T/F RECEIVED BACK ITEMS FORM SITE TO ESC, RAEBARELI AND WORK SITES ALONG WITH LOADING, UN-LOADING AT BOTH ENDS AND PROPER STACKING Please Enable Macros to View BoQ information |