Tender For Laying C.C.Lining Of Noorpur Dy. From Km.18.000 To Km. 19.310, Parpa Mr. From Km. 6.000 To Km. 8.850, Beeghepur Mr. From Km. 0.000 To Km. 2.000, Galand Mr. From Km. 0.000 To Km. 1.230, Dhabarsi Mr. From Km. 1.400 To Km. 2.800, Kapoorpur Mr, Bulandshahar-Uttar Pradesh
TDR : 54575484
Tender Notice
BOQ
11 Days Left
Bulandshahar
Uttar Pradesh
Tender For Laying C.C.Lining Of Noorpur Dy. From Km.18.000 To Km. 19.310, Parpa Mr. From Km. 6.000 To Km. 8.850, Beeghepur Mr. From Km. 0.000 To Km. 2.000, Galand Mr. From Km. 0.000 To Km. 1.230, Dhabarsi Mr. From Km. 1.400 To Km. 2.800, Kapoorpur Mr
Name of Work:- Laying C.C.Lining of Noorpur Dy. from Km.18.000 to Km. 19.310, Parpa Mr. from Km. 6.000 to Km. 8.850, Beeghepur Mr. from Km. 0.000 to Km. 2.000, Galand Mr. from Km. 0.000 to Km. 1.230, Dhabarsi Mr. from Km. 1.400 to Km. 2.800, Kapoorpur Mr. from Km. 3.550 to Km. 3.750, Meethepur Mr. from Km. 0.000 to Km. 6.500 & Km. 1.200 to Km. 1.500 and Maholi Mr. from Km. 0.000 to Km. 0.800 in Juridiction of IInd Sub-div. in Distt. Gaziabad, Hapur and Bulandshahr.
Sl. No.
Item Description
1
Earth work in excavation /cutting soils in making proper correcting section including lead up to 30m and lift up to 1.5m including dressing and making profile etc.complete.
2
Earth work in embankment by power transported earth with a lead beyond 200 m and upto 1.0 km including excavation, loading, unloading, manual compaction dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders.
3
Centering and shuttering for CC work including cost of all material labour and T&Petc.required for proper complection of work.
4
Providing and laying Cement concrete (1:3:6) with cement , coarse sand , and 10mm to 25mm stone grit including cost of all material, labour and T&P etc.complete.
5
Providing and laying fine sand (Not less than 1.25 F.M.) in filter including cost of all material, labour and T&P etc. complete.
6
Painting on Top of sleeper with (Bitumen VG-10 grade @ one kg /sqm including cost of all material, labour and T&P etc. complete.
7
Supplying and laying 200 micron L.D.P.E. film including cost of all material, labour and T&P etc. complete.
8
Providing 60 mm thick C.C. in bed and side slope in 1:2:4 (1 cement : Coarse sand and stone grit 10-20 mm size) including all cost of labour, material, T&P etc. for proper comlection of work.
9
Filling joints in C.C.lining work with bituminous compound, including cost of all material ,labour and T&P etc. complete. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.