| 1 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 Excavation with hydraulic excavator of 0.9 cum bucket capacity including cutting trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lift and combined lead up to 60 mtr. |
| 2 | Loosening, leveling and compacting original ground up to a level of 500mm below road crust, mixed with water at OMC, levelled, graded and compacted in layers by rolling so as to achieve minimum dry density as given in Table 300-2 for sub grade construction as per technical clause 305 of MORT&H specifications |
| 3 | Construction of granular sub-base by providing material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MORD technical specifications |
| 4 | Construction of granular sub-base by providing material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MORD technical specifications (Labour Rate) |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per technical clause 406 of MORT&H specifications |
| 6 | Providing and applying primer coat with bitumen emulsion SS on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/sqm complete as per technical clause 502 of MORT&H specifications |
| 7 | Tack Coat @ 0.25kg per sqm Providing and applying tack coat with bitumen emulsion RS using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical clause 503 of MORT&H specifications |
| 8 | Dense Graded Bituminous Macadam 50mm to 75mm thickness (Grading II) Providing and laying dense graded bituminous macadam 50mm to 75mm thick with Continuous type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5%, laying with a Paver Finisher Mechanical to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 505 of MORT&H specifications |
| 9 | Bituminous Concrete 30mm to 45mm thickness (Grading II) Providing and laying bituminous concrete 30mm to 45mm thick with Continuous type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4%, laying with a Paver Finisher Mechanical to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of MORT&H specifications |
| 10 | Road marking with hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 0.25kg per sqm area as per IRC:35 1997 complete as per technical clause 803 of MORT&H specifications |
| 11 | Providing and laying 50 mm thick factory made cement concrete interlocking paver block of M-35 grade machine made rubber moulded smooth finish with strong vibratory process or with vibrohydraulic compaction machine and of approved size and design / shape laid in Ordinary Grey and pattern over and including 40 mm thick compacted bed of coarse sand, filling the joints with fine sand etc, all complete as per directions of Engineer-in-Charge. IS Code: 15658(2006) |
| 12 | Providing and laying factory made rubber moulded smooth finish cement concrete Kerb M-20 grade 250mm high with bottom width 165mm and top width 115mm made over strong vibratory table and fixing with cement mortar 1:2 as per MORT&H specifications |
| 13 | Scraping White wash and colour wash |
| 14 | Preparation of plastered or concrete surface for painting (including sand papering the surface) using ready mixed cement based wall putty by applying two or more coats to get required finish |
| 15 | Finishing walls with acrylic smooth exterior paint of required shade with two or more coats applied @ 1.67 litre/10Sqm over and including base coat of water proofing Cement Paint applied @ 2.20 Kg/10 Sqm |
| 16 | Constructing brick masonry road gully chambers as per standard drawings (as per sizes given below) including dressing of beds and sides of chambers to exact profiles, 15cm thick C.C 1:6:12 in foundation, first class brick work laid in cement sand mortar 1:5, 40mm thick cement concrete 1:2:4 topping inside the chamber with a floating coat of 1.5mm thick neat cement laid in one operation to the topping, the entire inner surface of the chamber rendered with neat cement not less than 12.50mm in thickness of 1:2 cement sand plaster and finished with a floating coat of neat cement 1mm thick left absolutely smooth polished and correct to template including cost of precasted RCC road gully grating and frame including paint with coal tar complete and as required by the Engineer-In-Charge.Single Road Gully chamber. Size 610mm x 457mm x 800mm |
| 17 | Providing, lowering in trenches to correct gradient and alignment, jointing with tyton rubber joint and cutting of reinforced cement concrete spigot and socketed pipes and specials with rubber ring ISI marekd as per IS code IS 458-2003 into trenches for all depths and laying out the same to correct alignment, gradients, levels etc. cutting of concrete beds and joints holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelopes are completed. The pipes shall rest on the beds at all joints through their lengths and fixing of rubber ring, facing, testing the pipes for leakage and making good the same leakage and all defects to the entire satisfaction of the Engineer-in-charge including all cartage etc.R.C.C. Pipe NP -3 .200mm i/d pipe |
| 18 | Disposal of malwa from site of work to disposal site with all lead complete in all respect and to the entire satisfaction of engineer in charge. |
| 19 | Add 5.35% Difference of GST from 12% to 18% |
| 20 | Add 1% Culture cess Please Enable Macros to View BoQ information |