| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. |
| 3 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: In case the cement content in design mix is more than 10% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level :Concrete of M10 grade with minimum cement content of 220 kg /cum |
| 4 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: In case the cement content in design mix is more than 10% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level :Concrete of M25 grade with minimum cement content of 300 kg /cum |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for :(a )Foundations, footings, bases of columns, etc. for mass concrete |
| 6 | (b )Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 7 | (c) Suspended floors, roofs, landings, balconies and access platform |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 9 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: In case the cement content in design mix is more than 10% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level Concrete of M50 grade with minimum cement content of 410 kg/cum |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. |
| 11 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 12 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 13 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar |
| 14 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 15 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 16 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 17 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 18 | Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer -in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost). |
| 19 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 250 mm dia. R.C.C. pipe |
| 20 | Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and fixing over 20mm thick bed of Cement mortar 1:4 (1 cement : 4 coarse sand) etc. all complete as per the direction of Engineer-in-charge. |
| 21 | Modified estimated cost after using correction factor on DSR 2023 on account of GST @ 0.973 (Vide office memorandum issued from CPWD vide E-file No. 9158977 dated 08.08.2024)(vide 158/SE(TAS)/GST/2024/314-H Dated 03.10.2024 |
| 22 | Add 3% Cost Index |
| 23 | Credit of old dismantled MS steel/MS Angle/MS Flat/MS Bar etc. received after dismantling at site all complete as per directions of Engineer-in-charge.(Based on market rates) |
| 24 | Credit for Old dismantle Interlocking paver tile as per direction of engineer-in-charge. |
| 25 | Deduct for the credit on account of cost of dismantled unserviceable bricks received from dismantling , including dismantling removal & disposal from the site and cleaning the site all complete as per the direction of Engineer-in-charge complete. The dismantled unserviceable material shall become the property of contractors after dismantling duly weighed/measured before removing from the site in the presence of Engineer-in-charge or his authorised respective. |
| 26 | Providing & Fixing Fabricated and manufactured solid RCC precast drain, drain cover, box culvert and other precast concrete element (Concrete grade M50) with provisions of shear keys, connecting loops, dowel tubes and proper lifting accessories for walls, beams, slabs, stairs, column, drain, drain cover etc. of various thickness, shape and size of different concrete grades manufactured in controlled factory environment with approved methodology including moulds (Pallet system, Tilts form, table moulds, battery moulds, vertical moulds, beam moulds, column moulds, staircase moulds, Facade mould, etc.), mixing, transporting and placing of concrete, vibrating, curing, finishing, making necessary cutout/holes of required sizes for services, yard handling & stacking all complete as per IS 11447:1985 and as per approved shop drawings, IS Code and design mix as per the direction of Engineer-in-Charge.Providing Thermo-Mechanically Treated bars of grade Fe-500D or more in precast U shaped drain, drain cover and other precast concrete element as per approved shop drawing for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.The transportation of RCC precast drain, drain cover, box culvert and other precast concrete element upto any lead by flat bed Trailer (Double / Triple axle 40ft. Length with proper accessories like A frame etc) from factory, including the cost of loading, unloading & stacking at site with the help of required capacity cranes.The Erection & Installation of RCC precast drain, drain cover, box culvert and other precast concrete element in correct & final position with proper line level and plumb at site making all arrangements (i.e cranes, push-pull jacks & all another T & P for lifting Placing & Alignment of elements, within erection tolerance as per IS 15916 as per approved shop drawings and all complete as per the direction of Engineer-in-Charge including the cost of shim pads, non shrink grout and steel works i.e hangers. All work upto plinth level.RCC precast manufactures shall have facilities of automated steam curing and automated reinforcement cage making along with product testing facility and NABL approved testing laboratory within plant premises.The precast drain shall be capable of carrying a wheel load of minimum 5.00 tonne for heavy vehicle movement.Concrete grade M-50 (Cement content 410 kgs) Please Enable Macros to View BoQ information |