|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5(i) Private Land 'For Helipads-- 3 nos. |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(ii) For Grading II Material 'For Helipads-- 3 nos. |
| 3 | Wet Mix MacadamProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.By Mechanical Means with 1 km lead 'For Helipads-- 3 nos. |
| 4 | Interlocking pavement block:Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage.Including Edge block/ Edge restraints 'For Helipads-- 3 nos. |
| 5 | Painting Two Coats on New Concrete SurfacesPainting twocoats includingprimer coat after filling thesurfacewithsyntheticenamelpaint inallshadesonnew,plastered/concretesurfacesasperdrawingand Technical Specification Clause 1701 |
| 6 | Providing Bamboo Barricading along the Periphery of Temporary Helipad |
| 7 | Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202. Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately 'For Helipads-- 3 nos. |
| 8 | Loading and Unloading of C.C. Blocks, Kerb, etc. (i) LoadingwithcareC.C.Blocks, kmStone,200mStone,BoundaryPillar,Kerb,Channel, Bond Stone, etc. by manual means including a lead upto 30 m |
| 9 | 1.10 Haulage excluding Loading & Unloading A Haulage of materials by tipper excluding cost of loading, unloading and stacking.Case-I : Surfaced Road |
| 10 | (ii) Unloading with care C.C.Blocks,km Stone,200 m Stone,Boundary Pillar,Kerb, Channel, Bond Stone, etc. by manual means including a lead upto 30 m Please Enable Macros to View BoQ information |