| 1 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. |
| 2 | Providing and constructing 75 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone metal layers 100% crusher broken metal with conical crusher plant heating and spraying the bitumen of specified grade @ 2 Kg/sqm, spreading 12 mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 3 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates)Rates excluding GST) |
| 4 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 5 | Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 6 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete |
| 7 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete |
| 8 | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete. |
| 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. |
| 10 | Add for Royalty charges for item no 5 of S.E.1 |
| 11 | BASIC TEST OF AGGREGATE. Water Absorption, Specific Gravity,Impact Value Crushing Value test. |
| 12 | BASIC TEST OF AGGREGATE. Sieve Analysis test. |
| 13 | BASIC TEST OF AGGREGATE. Flakiness Index/ Elongation Index test. |
| 14 | BASIC TEST OF AGGREGATE. Stripping Value test. |
| 15 | BITUMEN Penetration, Softening Point, Flash & Fire Point and Specific Gravity test. |
| 16 | BITUMEN Viscosity test. |
| 17 | BITUMEN Penetration, Softening Point, Flash & Fire Point and Specific Gravity test. |
| 18 | BITUMEN Viscosity test. |
| 19 | BASIC TEST OF AGGREGATE. Water Absorption, Specific Gravity,Impact Value Crushing Value test. |
| 20 | BASIC TEST OF AGGREGATE. Sieve Analysis test. |
| 21 | BASIC TEST OF AGGREGATE. Flakiness Index/ Elongation Index test. |
| 22 | BASIC TEST OF AGGREGATE. Stripping Value test. |
| 23 | BITUMEN Penetration, Softening Point, Flash & Fire Point and Specific Gravity test. |
| 24 | BITUMEN Viscosity test. |
| 25 | BITUMEN Extraction Test. |
| 26 | Sieve analysis of Bituminous mix (2 Samples of extraction for one sieve analysis including extraction) |
| 27 | BASIC TEST OF AGGREGATE. Water Absorption, Specific Gravity,Impact Value Crushing Value test. |
| 28 | BASIC TEST OF AGGREGATE. Sieve Analysis test. |
| 29 | BASIC TEST OF AGGREGATE. Flakiness Index/ Elongation Index test. |
| 30 | BASIC TEST OF AGGREGATE. Stripping Value test. |
| 31 | BITUMEN Penetration, Softening Point, Flash & Fire Point and Specific Gravity test. |
| 32 | BITUMEN Viscosity test. |
| 33 | SOIL / MURUM Sieve Analysis test. |
| 34 | SOIL / MURUM Liquid limit & plastic Limit test. |
| 35 | SOIL / MURUM C.B.R. Test (Lab) with compaction test. Please Enable Macros to View BoQ information |