| 1 | Earth work in embankment by power transported earth with a lead beyond 200m. And upto 1.00 km. including excavation, loading, unloading, manual compaction, dressing etc required for proper completion of work. |
| 2 | Providing and filling Coarse Sand i/c cost of all labour material and t&p etc required for proper completion of work. |
| 3 | Laying Coarse sand filter below c.c. block i/c cost of labour, material and T&P etc required for proper completion of work. |
| 4 | Laying Coarse aggregate filter (5-10mm) below c.c. block i/c cost of labour, material and T&P etc required for proper completion of work. |
| 5 | Laying Coarse aggregate filter (10-20mm) below c.c. block i/c cost of labour, material and T&P etc required for proper completion of work. |
| 6 | Cast in situ C.C. Block(size 1.5m.x1.5m.x0.9m.) in M-25 Grade i/c cost of all labour, material and T&P etc required for proper completion of work. |
| 7 | Providing and filling Boulder / splite stone with 20 to 40 kg in recouping of launching apron i/c cost of all labour, material and T&P etc required for proper completion of work. |
| 8 | Surface Dewatering for execution of works i/c all Arrangement in kwh by diesel pump set etc required for proper completion of work. |
| 9 | Providing and filling stone grit in joints and graded filter of C.C. block i/c cost of all labour, material and T&P etc required for proper completion of work. |
| 10 | Providing and laying C.C. 1:2:4 i/c cost of labour material t&P etc required for proper completion of work. |
| 11 | Centering & Shuttering for C.C. Work i/c cost of all labour, material and T&P etc required for proper completion of work. |
| 12 | Providing & laying 80 mm. thick factory made C.C. Interlocking coloured tiles/paver including 50mm thick compacted bed of fine sand proper embedding/laying of interlocking tiles leveling and dressing of surface to required level and slope, filling, joints with fine sand and below it laying 0.10m. thick base concrete in 1:2:4 with cost of all materials, labour and T&P etc required for proper completion of work. |
| 13 | Earth work in cleaning silt of pond at u/s barrage with disposal upto lead of 4.0 Km by power transport i/c cost of all labour, carriage, T&P etc. required for proper completion of work. |
| 14 | R.C.C Work in 1:1.5:3 excluding Centring and Shuttering and reinforcement but i/c cost of all labour, material and T&P etc. required for proper completion of work. |
| 15 | Centering & Shuttering for R.C.C. Work i/c cost of all labour, material and T&P etc. required for proper completion of work. |
| 16 | Steel Reinforcement for R.C.C. Work i/c. it's straightening, cutting, bending, binding, and placing in position with cost of binding wire, cost of all materials, labour and T&P etc. required for proper completion of work. |
| 17 | Supplying and fixing of 3.6 meter high Jali i/c cost of all material, fabrication, painting, labour and T&P etc. required for proper completion of work. (Weight 81.32 Kg. per running metre) |
| 18 | Painting of MS Jali i/c all taxes, fabrication, painting, labour, material, T&P etc required for proper completion of work. |
| 19 | Making G.I. Wire crate with 8 SWG G.I. wire 150x150 mm mesh with double knot etc. required for proper completion of work. |
| 20 | Packing /filling Split Stone Boulders in wire crates with 20-40 kg wt. i/c cost of material, labour and T&P etc. required for proper completion of work. |
| 21 | 12.5 mm thick cement plaster in 1:4 cement mortar i/c all cost of labour, material and T&P etc required for proper completion of work. |
| 22 | Finishing wall with weather coat by primium acrylic exterion paint applied @1.67letre per 10sqm. (Asian or berger brand) of approved mack and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied @ 2.20kg /10sqm. after throughly brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply all materials, labour, T & P etc required for proper completion of work. Please Enable Macros to View BoQ information |