| 1 | Deweeding:-prooting rank vegetation and weeds by digging the area to a depth of 60cm, removing all weeds and other growth roots by forking repeatedly beraking clods rough dressing flooding with water uprooting fresh growths after 10 to 15days and then fine dressing for planting new grass including disposal of all rubbish with all leads and lift.Note:- Deweeding shall be measured in sqmt based on actual weeds coverages in the pond (pre photo) pictures shall have to be supported with the estimate |
| 2 | Dewatering of Sludge water by pumping pump with 5HP diesel engine |
| 3 | Supplying all materials labour T&P, Excavation of any available type of soil by mechanical means loading into and transportation by mechanical means and unloading the soil within the Pond Area on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction by mechanical means but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the required specification and direction of Engineer-incharge. (measurement of the fill to be taken on the finished compacted section under OMC condition.) (AoR-2006, Page no-11, item No.1) |
| 4 | Supplying all materials , Labour, T&P and Fine dressing of earthwork in odinary or hard soil in road / Embankment formation including cost of cutting of filling earth upto 0.15 depth of surface etc all complete as per the required specifications and direction of Engineer in Charge. |
| 5 | Earth work in all kinds of soil within 50 Mtr initial lead and 1.5 mtr. initial lead and 1.5 mtr lift including rough dressing the bed as per direction of engineer in charge |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to with Wet Mix macadam .specification including premixing the material with water at OMC in mechanical mix plant , carriage of mixed material by tipper to site, laying and spreading in uniform layers with paver in sub base/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision) including all cost, conveyance, taxes of all materials and labour etc all complete as per the required specification and the direction of the Engineer-in- Charge) |
| 7 | Filling in foundation and plinth with fine mortar sand, watered and rammed, including materials etc. all complete. |
| 8 | Supplying all materials, labour and T&P for laying, fitting & fixing 60mm thick Cement Concrete inter locking paver blocks of M 30 grade of approved make, design, colour and size made by block making machine with proper compaction by mechanical means , cutting of paver blocks as per required size and pattern and laying the blocks in required pattern over the prepared hard base surface , finishing and sweeping extra sand in pathway including all cost, conveyance, taxes, royalities of all materials and T&P etc all complte confirming to IRC:SP-63:2018 and its ammendments if any etc all complete as per the specifications and directions of the Engineeer-in- Charge. |
| 9 | Kerb Stone: Supplying all materials, labour T&P andfitting and fixing of pre cast cement concrete kerb stone of size 300 x 300 x 150mm of M30 grade concrete of approved make, Design,colour and size made by block making machine with proper campaction fixed in required patern etc complete in all respect conforming to IS 5758:1984 etc all complete as per the specification and direction of the Engineer In Charge. |
| 10 | Supplying and Fitting Fixing of RCC Chair |
| 11 | Supplying, fitting & fixing of Stainless steel of 304 grade in hand railling using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe beacing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T&P etc. requered for the complete in all respect. Please Enable Macros to View BoQ information |