| 1 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 2 | Loading HT A type pole of all sizes to Hand cart from the stacking place and unloading the same at work site (excluding transportation). |
| 3 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 4 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 5 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 6 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 7 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 8 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 9 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 10 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 11 | Providing one Coil Earth using No.8 GI- earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 12 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. |
| 13 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 14 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 15 | Fitting and erecting one HT Double Pole Structure using PSC pole in position, providing 2 stays, fitting 8 channel cross arms, fitting AB switch, DO fuse, station class LA etc., drawing GI earthing leads (separate GI strip for LA through insulated conduit) to the ground, mounting of 100kVA Transformer on DP structure, clamping with Transformer belt, fixing 2way distribution box, DTR meter with box, giving all HT & LT connections upto OH lines, fixing/sign writing all statutory display boards etc. including digging & back filling pit in ordinary soil excluding provision of pipe earthing, yard fencing and metaling. |
| 16 | TRANSPORTING HT ABC BY HIRED VEHICLE TO A DISTANCE UP TO 5KM AND CARRYING UP TO ONE DRUM INCLUDING LOADING AND UNLOADING USING THE CRANE. |
| 17 | Unloading one Transformer (upto and including 160kVA) from any vehicle to ground including conveyance upto 25m at site. |
| 18 | Loading one Transformer (upto and including 160kVA) from ground to any vehicle including conveyance upto 25m at site. |
| 19 | Dismantling one Transformer (upto and including 160kVA) from existing structure and loading to any vehicle directly, including disconnecting HT/LT/Earth connections. |
| 20 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 21 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 22 | Dismantling one damaged LT TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 23 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 24 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 25 | Dismantling transformer station with transformer erected in DP structure by dismantling HT Double Pole Structure using PSC pole after disconnecting stay wires, 10 channel cross arms,AB switch, DO fuse, LA, GI earthing leads, DTR meter with box with metering equipments, CTs, Distribution Box, statutory display boards etc. but excluding the rate of dismantling transformer, earthing, stay sets & fencing. |
| 26 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles |
| 27 | Erection of suspension clamp for 11KV ABC of any size |
| 28 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 29 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or other terminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 30 | Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable |
| 31 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 32 | Quoted Amount of BOQ1 in figures |
| 33 | GST Rate in percentage Please Enable Macros to View BoQ information |