| 1 | Construction of Sluice (3 Nos) at Vayalangudi Kanmai in Embal Panchayat |
| 2 | Earth work excavation for foundation in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard red earth, shales, murrams, gravel hard rock requiring blasting etc., complete |
| 3 | Dismantling the Brick . Stone masonry in cement mortor walls under 3m height including cost and conveyance of all materials and labour for filling etc., complete |
| 4 | Dismantling the Plain cement concrete including all cost and conveyance of all materials and labour for filling etc., complete |
| 5 | Earth work excavation for foundation in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard red earth, shales, murrams, gravel hard rock requiring blasting etc., complete |
| 6 | Filling with M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications |
| 7 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 8 | Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification |
| 9 | Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer |
| 10 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 11 | PCC 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 12 | Refilling with excavatd soil other than sand complying with the standard specification for filling all cost and conveyance etc., complete |
| 13 | Provision for Plug rod etc., complete |
| 14 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 1 & 13 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |