| 1 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 2 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 3 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 4 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 5 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 6 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 7 | Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 8 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 9 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 10 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc. |
| 11 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 12 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. |
| 13 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. |
| 14 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Soft Rock. |
| 15 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 16 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 17 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 18 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 19 | Providing Fly stay for LT pole using LT PSC pole including digging and back filling pit in ordinary soil. |
| 20 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Rock. |
| 21 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 22 | Re-Tensioning one span 11kV line including replacing pin insulators, pin binding, jumpering, replacing insulators cross arms disc, tightening stay, cutting tree branches etc. wherever necessary, including conveyance of all materials complete. |
| 23 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 24 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 25 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. |
| 26 | Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole. |
| 27 | Renewal of existing damaged/broken old 11kV Stay to the existing stay rod. |
| 28 | Renewal of existing damaged/old 11kV PSC/RCC Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole. |
| 29 | Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole. |
| 30 | Renewal of existing damaged/old LT PSC/RCC (single phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole. |
| 31 | Renewal of existing damaged/old LT PSC/RCC (three phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole. |
| 32 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 33 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 34 | Renewal of existing damaged/broken old LT stay in existing stay rod. |
| 35 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 36 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. |
| 37 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 38 | Singe Phase Satellite connectors upto 4 service main connections (25-95 ABC/2.5-25 sqmm SM wire-2No) |
| 39 | Erection of suspension clamp for LT ABC of any size |
| 40 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 41 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 42 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 43 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 44 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 45 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |