|
| 1 | Supply Part |
| 2 | Supply of Aluminium Coil (wire) for HV/LV winding |
| 3 | Supply of Copper Coil (wire) for HV/LV winding |
| 4 | Supply of HT Bush Rod Up to 12 MM |
| 5 | Supply of LT Bush Rod Up to 12 MM |
| 6 | Supply of LT Bush Rod above 12 MM |
| 7 | Supply of HT Bushing (Suitable for up to 12 MM Bush Rod) |
| 8 | Supply of LT Bushing (Suitable for upto 12 MM Rod) |
| 9 | Supply of LT Bushing (Suitable for above 12 MM Rod) |
| 10 | Supply of Off Load Switch (200KVA to 500KVA) |
| 11 | Supply of Off Load Switch (above 500KVA & upto 1MVA) |
| 12 | Supply of On Load Tap Changer (200KVA to 500KVA) |
| 13 | Supply of On Load Tap Changer (above 500KVA & upto 1MVA) |
| 14 | Supply of Gasket (Standard size/Grade) Up to 100 KVA |
| 15 | Supply of Gasket (Standard size/Grade) above 100 KVA & upto 250 KVA |
| 16 | Supply of Gasket (Standard size/Grade) above 250 KVA & Upto 500 KVA |
| 17 | Supply of Gasket (Standard size/Grade) above 500 KVA & upto 1 MVA |
| 18 | Supply of Sundary items like Plug, Cape, Bolt, Valve etc. |
| 19 | Labour Part |
| 20 | Opening/Dismentling/Rewinding and Reassembling of HV/LV Limb (Leg) of Damaged 25KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms. |
| 21 | Opening/Dismentling/Rewinding and Reassembling of HV/LV Limb (Leg) of Damaged 63KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms. |
| 22 | Opening/Dismentling/Rewinding and Reassembling of HV/LV Limb (Leg) of Damaged 100KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms. |
| 23 | Opening/Dismentling/Rewinding and Reassembling of HV/LV Limb (Leg) of Damaged 200/250KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms. |
| 24 | Opening/Dismentling/Rewinding and Reassembling of HV/LV Limb (Leg) of Damaged 300/400KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms. |
| 25 | Opening/Dismentling/Rewinding and Reassembling of HV/LV Limb (Leg) of Damaged 500/630KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms. |
| 26 | Opening/Dismentling/Rewinding and Reassembling of HV/LV Limb (Leg) of Damaged 1MVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms. |
| 27 | Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 25KVA |
| 28 | Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 63KVA |
| 29 | Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 100KVA |
| 30 | Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 200/250KVA |
| 31 | Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 300/400KVA |
| 32 | Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 500/630KVA |
| 33 | Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 1MVA |
| 34 | Replacing of Damaged/wornout Off Load Switch/On Load Tap Changer Switch (200KVA to 500KVA) |
| 35 | Replacing of Damaged/wornout Off Load Switch/On Load Tap Changer Switch (Above 500KVA & upto 1MVA) |
| 36 | Minor repair like replacng of Damaged LT/HT Bush Rod , Bushing etc. & bracing/welding/Loose connection/denting if any |
| 37 | Welding/Bracing of Tank/Radiator/Conservator Tank etc (per 10cm) |
| 38 | Refilling of Oil after Filteration and then testing at factory site of 25KVA X'mer |
| 39 | Refilling of Oil after Filteration and then testing at factory site of 63KVA X'mer |
| 40 | Refilling of Oil after Filteration and then testing at factory site of 100KVA X'mer |
| 41 | Refilling of Oil after Filteration and then testing at factory site of 200KVA X'mer |
| 42 | Refilling of Oil after Filteration and then testing at factory site of 250KVA X'mer |
| 43 | Refilling of Oil after Filteration and then testing at factory site of 300KVA X'mer |
| 44 | Refilling of Oil after Filteration and then testing at factory site of 400KVA X'mer |
| 45 | Refilling of Oil after Filteration and then testing at factory site of 500KVA X'mer |
| 46 | Refilling of Oil after Filteration and then testing at factory site of 630KVA X'mer |
| 47 | Refilling of Oil after Filteration and then testing at factory site of 1MVA X'mer |
| 48 | Loading/Unloading and carriage charges of 25KVA Transformers from Divisional Store to Workshop (to & fro) |
| 49 | Loading/Unloading and carriage charges of 63KVA Transformers from Divisional Store to Workshop (to & fro) |
| 50 | Loading/Unloading and carriage charges of 100KVA Transformers from Divisional Store to Workshop (to & fro) |
| 51 | Loading/Unloading and carriage charges of 200/250KVA Transformers from Divisional Store to Workshop (to & fro) |
| 52 | Loading/Unloading and carriage charges of 300/400KVA Transformers from Divisional Store to Workshop (to & fro) |
| 53 | Loading/Unloading and carriage charges of 500/630KVA Transformers from Divisional Store to Workshop (to & fro) |
| 54 | Loading/Unloading and carriage charges of 1MVA Transformers from Divisional Store to Workshop (to & fro) |
| 55 | Per day Service charges of one technician for minor repair of Transformer at site. |
| 56 | Topping up of repaired transformer with fresh Oil |
| 57 | Scrap part |
| 58 | Cost of Worn out /Damaged (Scraps) of Aluminium Coil. |
| 59 | Cost of Worn out/Damaged (Scraps) of Copper Coil. |
| 60 | Cost of Worn out/Burnt out Oils. |
| 61 | Worn out/Damaged Sundry Items like Plug, Cape, Bolt, Valve etc. |
| 62 | Worn out/Damaged Sundry Items (Brass Items) like HT/LT Bush Rod etc. Please Enable Macros to View BoQ information |