| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) infoundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, includinggetting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m. All kinds of soil. |
| 2 | Excavating trenches of required width for pipes, cables, etc including excavationfor sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m,including getting out the excavated soil, and then returning the soil as required,in layers not exceeding 20 cm in depth, including consolidating each depositedlayer by ramming, watering, etc. and disposing of surplus excavated soil asdirected, within a lead of 50 m : All kinds of soilPipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia |
| 3 | Banking excavated earth in layers not exceeding20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller orwooden or steel rammers, and rolling every 3rd and top-most layer with powerroller of minimum 8 tonnes and dressing up in embankments for roads, floodbanks, marginal banks and guide banks or filling up ground depressions, leadupto 50 m and lift upto 1.5 m :All kinds of soil |
| 4 | Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - All work up to plinth level1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 gradedstone aggregate 20 mm nominal size derived from natural sources) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of formwork for :Foundations, footings, bases for columns |
| 6 | Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - All work up to plinth level1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 gradedstone aggregate 40 mm nominal size derived from natural sources) |
| 7 | Retaining walls, return walls, walls (any thickness) including attached pilasters,buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 8 | Supply and RCC perforated drain cover for both straight portion M30 grade of size 600x600x60mm with 9mm rode @100mm c/c cover the wall of drain at proper level for case flow of water. |
| 9 | Excavating, supplying and filling of local earth (including royalty) by mechanicaltransport upto a lead of 5km also including ramming and watering of the earth inlayers not exceeding 20 cm in trenches, plinth, sides of foundation etc.complete. |
| 10 | Providing and laying of polypropylene fiber Geoextile separation barrier 140GSM, as per the standard procedure complete as required |
| 11 | Construction of granular sub-base by providing close graded Material conformingto specifications, mixing in a mechanical mix plant at OMC, carriage of mixedmaterial by tippers to work site, for all leads & lifts, spreading in uniform layers ofspecified thickness with motor grader on prepared surface and compacting withvibratory power roller to achieve the desired density, complete as perspecifications and directions of Engineer-in-Charge.With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBRValue-30 |
| 12 | Providing, laying, spreading and compacting graded stone aggregate (size range53 mm to 0.075 mm ) to wet mix macadam (WMM) specification includingpremixing the material with water at OMC in for all leads & lifts, laying in uniformlayers with mechanical paverfinisher in sub- base / base course on well preparedsurface and compacting with vibratory roller of 8 to 10 tonne capacity toachievethe desired density, complete as per specifications and directions ofEngineer-in-Charge. |
| 13 | Providing and laying of synthetic artificial football turf of FIFA approved or preffered manufactred/ supplier and to be installed by FIFA/ FIH certified field builder. The job includes cutting , fixing and infilling of silica sand for stabilization and SBR Granules for per attain FIFA quality certificate . |
| 14 | Supply and installation of movable type football goal post approved by FIFA standard. |
| 15 | Construction of Rain water harvesting pit approx siz 4m lengthx4m width plan area as per design and drawing approved by Engineer-in-charge. |
| 16 | Carriage of materials from source to site by M.T Cement avg lead of 5 Km |
| 17 | Sand and stone aggregate avg lead of 8 Km Please Enable Macros to View BoQ information |