| 1 | LWSS RourjamanProviding & Installation of Horozontal spindle horizontal split casing/and suction(back pull out arrangement Single/double/multistage pump or combination of pump in series of Mather abd Platt/KSB/ set of KSB/Kirloskar make as per BIS 1520-1980 with upto date amendments, read with IS:9137-1978 or latest edition situable for lifting clear water.the pump should be fitted bronze impellers, priming funnels, casing rings, shaft sleeves of bronze, shaft of steel grade EN-8 with cast iron casing coupled directly through a flexible coupling of MS/Cast steel base plate (Base plate to be provided from the manufactures,s of the pumping unit only ) to squirrel cage drip proof induction motor of standerd make such as Kirloskar/Crompton/KSB/ confirming to BIS9238-1979 latest with upto date amendments and suitable for operation on 400(+/-) 10% volts, 50 cycles / Second, thress phase AC electric supply. The power of electric motor should be atleast 10% in excess of the maximum power required by the pump in the operation range of + 10% and - 15% of the duty point head. The motor should be as per IS:325-1978 with upto date amendments. The pump set situable for operation on data given below) Discharge:- 5.00 LPS per set, Total Dynamic head:- 311.00 Mtr,(1 No. working & 1 No. standby)Suction lift:-Positive, Dia of Rising main:-80 mm dia, Length of R/Main:-4445 Rmt, Pumping Hours:-8 Hours, |
| 2 | Providing and fixing of double flanged GMS piping network for suction and delivery pipes situable to pump offered and common header as per the rising main respectively complete with all special such as rappers, flanges, rubber gasket minimum 3 mm in thickness as per IS:2712-1979, nuts and bolts as per IS:1364-1983, bends, tees reducers/increaser with with companion flanges matching with the relevant specifications of the accessories as per drawing up to 5 mtr away from the outer wall of pump houses. The pipes shall be as per relevant IS code and to withstanb 1.50 times total head stipulated. The size of various components are as under:-Suction pipe 100 mm dia M.C minimum length= 5 MetreDelivery pipe 80 mm dia M.C minimum length= 10 MetreCommon header 100 mm dia M.C minimum length= 10 MetreThe GMS tube confirming to IS:1239-1979 part-I medium class flanged with MS Flanges table-5 in suction pipe and heavy class flanged with MS Flanges of table 17 in delivery side and common header.Quantity= 1 Job |
| 3 | Providing and laying copper PVC insulated armoured power 3.5 core cable ( one cable carrying all the three phases) of suitable size and capacity to and all other electrical equipments as per IS: 1554 (P-I)1988 or latest with upto date amendments of Siemens/ IEC/ICC/ make from metre of HPSEB to MCB and from MCB to bus bar switch and starter including all other accessories such as thimbles, flexible, pipes solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor.Motor side: suitable capacity Min length = 20 mtrs.Supply side: suitable capacity Min. length =10 mtrs.Quantity= 1 Job |
| 4 | Providing and fixing double loop earthing with copper plate 600mmx600mmx3mm thick electrode complete with material such as thimbles, nuts and bolts, charcoal and common salt, 25mmx3mm. G.I strips and G.I wire as per IS: 3043-1987 with upto date amendments for motors and other electrical equipments and digging of pits etc. complete in all respect.Quantity= 1 Job |
| 5 | Providing and instalation of VFD Starter for Centrifugal pump with SCADA based Automation |
| 6 | Supply , Installation, Testing and Commissioning of Energy Saving Variable Frequency Starter Panel for submersible pump made out of 16 Gauge sheet, powder coated dust and vermin proof, wall/base mounted and front opening door type with copper insulated wiring suitable to operate 2 Nos. pumps (1 working & 1 stand by) each of the rating 40 HP . Starter should be capable enough to handle the following faults like short circuit, over current, under current, over voltage, under voltage, dry run protection and phase loss with LED ON/OFF & TRIP indicators, Power Quality Monitoring & Controlling Relay at the Incomer Feeder, Should be fitted with Surge Suppressor Device suiatble to protect against class-1 & 2 surges.Make: Aarmation Electric/Tricolite/L S Controls/AdlecQuantity= 1 Nos. |
| 7 | Energy Saving Variable Frequency Starter of 40 HP Heavy Duty for smooth start and smooth stop of pumps and for the energy conservation in the system. It Should be capable to monitor & control the frequecy of pumps through out the operation and to maintain the power factor of the system within acceptable limits. It should be able to withstand ambient temperature upto 50 Degrees celcius without derating and have conformal coating class 3C2, so that it can work in any harsh environment like moisture etc. Make: JSV ApprovedQuantity= 1 Nos. |
| 8 | Multi function meter indicating different parameters like Current, Voltage, KWH, PF, THD etc. with RS 485 communication Make:- L&T/Conserve/SchniederQuantity= 1 Nos. |
| 9 | Main incomer MCCB of suitable capacity of L&T / Schnieder/ABB/Siemens make on the coming feeder for pumping set confirming to BIS 2516-1985 ( Latest edition).Quantity= 1 Nos. |
| 10 | LED Three phase indicating lamps complete with logged switches for individual motors conforming to BIS 3452 ( Part I & II ) latest with upto date ammendments.Quantity= 1 Sets |
| 11 | LED On / Off & Trip indicator and push buttons, Control and power wiring,Power capacitor,Cooling fan 230 VAC, Contorl terminal, Bus Bar, i.e.Bolt, insulator, etc.Quantity= 1 Sets |
| 12 | Selector Switch for Auto and Manual OperationQuantity= 1 Sets |
| 13 | Input Choke of required HP for Energy saving variable frequency Starter which should be installed at the input of Energy saving variable frequency starter, so that there should be proper protection in case of any voltage surge and distortions.Quantity= 2 Nos. |
| 14 | Control Transformer Make: JSV ApprovedQuantity= 1 Nos. |
| 15 | Power and Control Wiring and BusbarQuantity= 1 Nos. |
| 16 | Installation, Commissioning and Software DevelopmentQuantity= 1 Nos. |
| 17 | Surge supressor device with Isolating MCCB to eliminate the power surges due to lightening and system surges.Quantity= 1 Nos. |
| 18 | Power quality monitoring & controlling relay with Control Contactor to safeguard the Electronic & Electric elementsQuantity= 1 Nos. |
| 19 | Independent Control Panel with Switch Fuse Unit and Fuses of Suitable Amperage to eliminate the KItKat fuses of HPSEB Make: Siemens/Schnieder/L&T/reputed approved makeQuantity= 1 Sets |
| 20 | Supply Installation, Testing and Commissioning of PLC Control Panel with appropriate digital and analog inputs and outputs to give automatic command to Star Delta Starter Panel/ Energy Saving Variable Frequency Starter Panel Make Siemens/Allen Bredley/reputed approved makeQuantity= 1 Nos |
| 21 | Electronic relay card 8 channelQuantity= 1 Nos |
| 22 | SMPS 4.5 Amps to energise PLC systemQuantity= 1 Nos |
| 23 | HMI (Human Machine Interface) 7\\" display for Monitoring and Controlling of Centrifugal pumps Make: Bechoff Automation/Roackwell/ reputed approved makeQuantity= 1 Nos |
| 24 | Control MCB for Automation System Quantity= 1 Nos |
| 25 | Level Sensor to indicate the water level of tank remotelyQuantity= 2 Nos |
| 26 | Shielded Data Cable for Communication of Level Sensor with PLCQuantity= 1 Job |
| 27 | Supply of Mobile App (Android/IOS) with User ID and Password to monitor and control the pumping operation from Mobile for 3 users. Make: JSV ApprovedQuantity= 1 Job |
| 28 | Cloud GateWay for Data Clouding to ServerQuantity= 1 Job |
| 29 | SCADA software to be installed in Laptop/PC to remotely monitor and control the operation of pumps and also to analysis the pump start and stop history logging, fault status, fault history, Power Quality Parameters like PF, Current, Voltage, KWH, THD etc Make JSV ApprovedQuantity= 1 Job |
| 30 | Cloud Space for data storage at cloud/serverQuantity= 1 Job |
| 31 | Installation, Commissioning and Software DevelopmentQuantity= 1 Job |
| 32 | Note:- If any item is missing in pannel board of pump/PLC/ automation required to make the system functional will have to be executed in the above cost and two years maintenance cost is included in the cost of pannel board of pump & automation. |
| 33 | LWSS DabatProviding & Installation of Horozontal spindle horizontal split casing/and suction(back pull out arrangement Single/double/multistage pump or combination of pump in series of Mather abd Platt/KSB/ set of KSB/Kirloskar make as per BIS 1520-1980 with upto date amendments, read with IS:9137-1978 or latest edition situable for lifting clear water.the pump should be fitted bronze impellers, priming funnels, casing rings, shaft sleeves of bronze, shaft of steel grade EN-8 with cast iron casing coupled directly through a flexible coupling of MS/Cast steel base plate (Base plate to be provided from the manufactures,s of the pumping unit only ) to squirrel cage drip proof induction motor of standerd make such as Kirloskar/Crompton/KSB/ confirming to BIS9238-1979 latest with upto date amendments and suitable for operation on 400(+/-) 10% volts, 50 cycles / Second, thress phase AC electric supply. The power of electric motor should be atleast 10% in excess of the maximum power required by the pump in the operation range of + 10% and - 15% of the duty point head. The motor should be as per IS:325-1978 with upto date amendments. The pump set situable for operation on data given below) Discharge:- 3.78 LPS per set, Total Dynamic head:- 147.00 Mtr,(1 No. working & 1 No. standby)Suction lift:-Positive, Dia of Rising main:-50 mm dia, Length of R/Main:-2600 Rmt, Pumping Hours:-8 Hours, |
| 34 | Providing and fixing of double flanged GMS piping network for suction and delivery pipes situable to pump offered and common header as per the rising main respectively complete with all special such as rappers, flanges, rubber gasket minimum 3 mm in thickness as per IS:2712-1979, nuts and bolts as per IS:1364-1983, bends, tees reducers/increaser with with companion flanges matching with the relevant specifications of the accessories as per drawing up to 5 mtr away from the outer wall of pump houses. The pipes shall be as per relevant IS code and to withstanb 1.50 times total head stipulated. The size of various components are as under:-Suction pipe 65 mm dia M.C minimum length= 5 MetreDelivery pipe 50 mm dia M.C minimum length= 10 MetreCommon header 65 mm dia M.C minimum length= 10 MetreThe GMS tube confirming to IS:1239-1979 part-I medium class flanged with MS Flanges of table 5 in suction pipe and heavy class flanged with MS Flanges of table 17in delivery side and common header. |
| 35 | Providing and laying copper PVC insulated armoured power 3.5 core cable ( one cable carrying all the three phases) of suitable size and capacity to and all other electrical equipments as per IS: 1554 (P-I)1988 or latest with upto date amendments of Siemens/ IEC/ICC/ make from metre of HPSEB to MCB and from MCB to bus bar switch and starter including all other accessories such as thimbles, flexible, pipes solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor.Motor side: suitable capacity Min length = 20 mtrs.Supply side: suitable capacity Min. length =10 mtrs.Quantity= 1 Job |
| 36 | Providing and fixing double loop earthing with copper plate 600mmx600mmx3mm thick electrode complete with material such as thimbles, nuts and bolts, charcoal and common salt, 25mmx3mm. G.I strips and G.I wire as per IS: 3043-1987 with upto date amendments for motors and other electrical equipments and digging of pits etc. complete in all respect. |
| 37 | Providing and instalation of VFD Starter for Centrifugal pump with SCADA based Automation |
| 38 | Supply , Installation, Testing and Commissioning of Energy Saving Variable Frequency Starter Panel for submersible pump made out of 16 Gauge sheet, powder coated dust and vermin proof, wall/base mounted and front opening door type with copper insulated wiring suitable to operate 2 Nos. pumps (1 working & 1 stand by) each of the rating 15 HP . Starter should be capable enough to handle the following faults like short circuit, over current, under current, over voltage, under voltage, dry run protection and phase loss with LED ON/OFF & TRIP indicators, Power Quality Monitoring & Controlling Relay at the Incomer Feeder, Should be fitted with Surge Suppressor Device suiatble to protect against class-1 & 2 surges.Make: Aarmation Electric/Tricolite/L S Controls/AdlecQuantity= 1 Nos |
| 39 | Energy Saving Variable Frequency Starter of 15 HP Heavy Duty for smooth start and smooth stop of pumps and for the energy conservation in the system. It Should be capable to monitor & control the frequecy of pumps through out the operation and to maintain the power factor of the system within acceptable limits. It should be able to withstand ambient temperature upto 50 Degrees celcius without derating and have conformal coating class 3C2, so that it can work in any harsh environment like moisture etc. Make: JSV ApprovedQuantity= 1 Nos |
| 40 | Multi function meter indicating different parameters like Current, Voltage, KWH, PF, THD etc. with RS 485 communication Make:- L&T/Conserve/SchniederQuantity= 1 Nos |
| 41 | Main incomer MCCB of suitable capacity of L&T / Schnieder/ABB/Siemens make on the coming feeder for pumping set confirming to BIS 2516-1985 ( Latest edition).Quantity= 1 Nos |
| 42 | LED Three phase indicating lamps complete with logged switches for individual motors conforming to BIS 3452 ( Part I & II ) latest with upto date ammendments.Quantity= 1 Sets |
| 43 | LED On / Off & Trip indicator and push buttons, Control and power wiring,Power capacitor,Cooling fan 230 VAC, Contorl terminal, Bus Bar, i.e.Bolt, insulator, etc.Quantity= 1 Sets |
| 44 | Selector Switch for Auto and Manual OperationQuantity= 1 Sets |
| 45 | Input Choke of required HP for Energy saving variable frequency Starter which should be installed at the input of Energy saving variable frequency starter, so that there should be proper protection in case of any voltage surge and distortions.Quantity= 2 Nos |
| 46 | Control Transformer Make: JSV ApprovedQuantity= 1 Nos |
| 47 | Power and Control Wiring and BusbarQuantity= 1 Nos |
| 48 | Installation, Commissioning and Software DevelopmentQuantity= 1 Nos |
| 49 | Surge supressor device with Isolating MCCB to eliminate the power surges due to lightening and system surges.Quantity= 1 Nos |
| 50 | Power quality monitoring & controlling relay with Control Contactor to safeguard the Electronic & Electric elementsQuantity= 1 Nos |
| 51 | Independent Control Panel with Switch Fuse Unit and Fuses of Suitable Amperage to eliminate the KItKat fuses of HPSEB Make: Siemens/Schnieder/L&T/reputed approved makeQuantity= 1 Sets |
| 52 | Supply Installation, Testing and Commissioning of PLC Control Panel with appropriate digital and analog inputs and outputs to give automatic command to Star Delta Starter Panel/ Energy Saving Variable Frequency Starter Panel Make Siemens/Allen Bredley/reputed approved makeQuantity= 1 Nos |
| 53 | Electronic relay card 8 channelQuantity= 1 Nos |
| 54 | SMPS 4.5 Amps to energise PLC systemQuantity= 1 Nos |
| 55 | HMI (Human Machine Interface) 7\\" display for Monitoring and Controlling of Centrifugal pumps Make: Bechoff Automation/Roackwell/ reputed approved makeQuantity= 1 Nos |
| 56 | Control MCB for Automation System Quantity= 1 Nos |
| 57 | Level Sensor to indicate the water level of tank remotelyQuantity= 2 Nos |
| 58 | Shielded Data Cable for Communication of Level Sensor with PLCQuantity= 1 Job |
| 59 | Supply of Mobile App (Android/IOS) with User ID and Password to monitor and control the pumping operation from Mobile for 3 users. Make: JSV ApprovedQuantity= 1 Job |
| 60 | Cloud GateWay for Data Clouding to ServerQuantity= 1 Job |
| 61 | SCADA software to be installed in Laptop/PC to remotely monitor and control the operation of pumps and also to analysis the pump start and stop history logging, fault status, fault history, Power Quality Parameters like PF, Current, Voltage, KWH, THD etc Make JSV ApprovedQuantity= 1 Job |
| 62 | Cloud Space for data storage at cloud/serverQuantity= 1 Job |
| 63 | Installation, Commissioning and Software DevelopmentQuantity= 1 Job |
| 64 | Note:- If any item is missing in pannel board of pump/PLC/ automation required to make the system functional will have to be executed in the above cost and two years maintenance cost is included in the cost of pannel board of pump & automation. Please Enable Macros to View BoQ information |