| 1 | Drain WORK :-Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 2 | Filling in foundation or plinth by silver sand in layers not exeeding 150 mm as dtrected and consolidating the same by thorough saturation With water , ramming, complete including the co of supply of sand. ( Do by fine sand ) |
| 3 | Single Brick Flat Soling of picked jhamabricks including rammingand dressingbed to proper level and filling joints with local sand |
| 4 | Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all PCC Grade M20 I. Using Concrete Mixer (i) For solid slab super-structure,a) Height upto 5m |
| 5 | Supplying, fitting and placing HYSD bar reinforcement in bridge sub structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction |
| 6 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints incl. throating, nosing & drip course, scaffolding/staging where necessary (ground floor) [excluding cost of chipping over concrete surface] |
| 7 | Labour for chipping over concrete surface before taking up plastering worK |
| 8 | Neat cement punning about 1.5 mm thiuck in wall , dado ,window sill ,floor etc |
| 9 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour.3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement |
| 10 | (A) M.S .or W.I. Ornamental grill of approved design joints continuously welde d with M.S , W.I . Flats and bars of window railing etc. fitted and fixed withnecessary screws and lugs. |
| 11 | Dismantling of existing structure like culvert, bridges ,retaining walls and other structur |
| 12 | Supplying and laying Polythene Sheet (150gm / sq.m.) overdamp proof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 13 | GST, as applicable @ 18% . |
| 14 | Labour welfare cess @1% . Please Enable Macros to View BoQ information |