| 1 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. (Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof).For structural members of specified sections weighing less than 22.5 Kg./m |
| 2 | Supplying and stacking of good earth (adequate for horticulture work) at site including royalty (earth measured in stack will be reduced by 20% for payment). |
| 3 | Making lawns including ploughing and breaking of clod, removal of rubbish, dressing and supplying doobs grass roots and planting at 15 cm apart, including supplying and spreading of farm yard manure at rate of 0.18 cum per 100 sqm. |
| 4 | Spreading of sludge farm yard manure or / and good earth in required thickness (cost of sludge, farm yard manure or / and good earth to be paid for separately). |
| 5 | Supply of expert Mazdoor for supervision and maintaing graden and horticulture plantation through out the year, all types of works in this connection (Considering 1 x 180 Mazdoor Six Months) (Reckoned from the day of start as per direction of EIC, for Six Months).Maintenance of Lawns or Turfing and Gardening. |
| 6 | Planting permanent hedges including digging of trenches, 60 cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard manure, supplied at the rate of 4.65 cum per 100 metres and supplying and planting hedge plants at 30 cm apart.Planting of Permanent Hedges. |
| 7 | Supplying, fitting and fixing PVC pipes for underground work of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted including cost of all materials ,jointing materials, cutting pipes, making threads ,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.) (a) 32 mm |
| 8 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, levelling, dressing and ramming the bottom, bailing out water as required complete.a) Depth of excavation not exceeding 1,500 mm. |
| 9 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity). |
| 10 | Ordinary Cement concerete(mix1:2:4) with graded stone chips (20 mm nominal size) excluding and reinforcement if any, in ground floor as per relevant IS codes (d)with local hard black stone variety chips(crusher broken). |
| 11 | Hire and labour charges for shuttering with centering and necessary staging upto 4m. Using approved stout props and thick hard wood planks of striking out after completion of work (upto roof of ground floor). A)25mm to 30mm thick wodden shuttering as per decision & direction of engineer-in-charge. For Ground Floor and Foundation. |
| 12 | Brick work with 1st class bricks in cement morter (1:6) (a) in Foundation. |
| 13 | Plaster (to wall,floor,celing etc)with sand and cement mortar including rounding off or chamfering corners as directed and racking out joints including throating, nosing . with (1:6) cement morter & 15 mm thick plaster (Ground Floor). |
| 14 | Neat cement punning about 1.5 mm. Thick in wall dado, window, sills, floor, drain etc. |
| 15 | Supplying and laying true to line and level High Grip, Scratch resistant, Neutral to UVrays,Full Body Vitrified Tiles conforming to IS:15622-2006& IS4457-2007and test ed inaccordance withIS:13630 [Non-modular sizes for tiles with Skid resistance:0.6,Mohr'shardness>7.0,Staining resistance:Class1,Water AbsorptionE<0.5%]&MOR>35N/sq.mmand Breaking strength> 1500N for Outdoor area of building e. g. Gang-way, Corridor, Driveway, Parkinglots,Courtyards,Slop ingramps,Entrance lobbies,Patios,Porticoetc. set over necessary underlay and 2mm thick cement slurry at backside of tiles using [email protected]./Sqm, joints grouted with admixture of white cement and colouring pigment to match with colour of tiles and removal of wax coating of top surface of tiles with warm water and cleaning the tiles using soft and dry cloth complete including the cost of materials, labour and allother incidental charges complete including back side slurry but excluding the cost of underlay and true to the manufacturer's specification and direction of Engineer-in Charge. |
| 16 | Add GST @ 18% |
| 17 | Add Labour well fare Cess @1% of Gross Bill Value Please Enable Macros to View BoQ information |