| 1 | PWD schedule of Road Page No. - 247, Item No. - 4.09Construction of Sub Base using Local Materials:Construction of Sub Base using Local Materials,spreading in uniform layers with Motor grader onprepared surface, including screening the metal asnecessary, mixing by mix in place method withRotavator at OMC, and compacting with vibratoryroller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(iv) For Construction of Sub Base by compacting river bed materials.Note: Add cost at site of 1.28 m³ of materials to arrive at thecomplete rate. |
| 2 | PWD schedule of Road Page No. - 333, Item No. - 18.07Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. (a) M-15 Grade Using concrete mixer |
| 3 | PWD schedule of Road Page No. - 333, Item No. - 18.07Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. (b) M-20 Grade Using concrete mixer. |
| 4 | PWD schedule of Road Page No. - 332, Item No. - 18.05Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required. |
| 5 | PWD schedule of Road Page No. - 237, Item No. - 3.01Earthwork in excavation from borrow pits (land owned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fill up back of abutments, depressions and ruts with an initial lead up to 50 m andinitial lift up to 1.5 m making bunds at top as directed dressing complete. (Borrow pit measurement) (i) In ordinary soil |
| 6 | Providing & fixing Concrete Sign Board as per IRCspecification of size 900 x 750 x 37 mm. thick madewith RCC 1:1½:3 with pakur variety stone chipsreinforced with double layer IRC febric (75 x 75 mm.mesh) and fixed with necessary nuts & bolts on twoRC precast posts 100 mm. x 150 mm. of height 2.65m. of which top 750 mm. is of section 100 x 13 mm.and 1.90 metre above GL & 0.75 metre below GLincluding digging hole, repacking the same withcement concrete 1:3:6 with jhama khoa or with localstone chips etc. complete including painting twocoats on both faces lettering sign marks etc. as perdirection of the Engineer-in-Charge. (The rate isinclusive of cost of reinforcement, concrete,shuttering, nuts & bolts, washer etc. complete.) |
| 7 | Add:- GST @ 18% |
| 8 | Add:- Labour Welfare Cess @ 1% Please Enable Macros to View BoQ information |