| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil |
| 2 | Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. |
| 3 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 4 | 35mm thick Cement Concrete Pavement (1:2:4) in floor/footpath etc. with graded stone chips 11.2mm down,properly leveled with 3mm thick screen on top by cement slurry [email protected] cement per Sqm. Rounding off corners, chequering as required including taking necessary protective measure complete in Gr.floor/footpath. |
| 5 | SUPPLYING AND LAYING IN THE SPECIFIED PATTERN OF INTERLOCKING CONCRETE BLOCK PAVEMENTS (ICBP) WITH CONCRETE BLOCKS ( WITH CONCRETE GRADE AS SPECIFIED AS PER TABLE OF IS 15658 : 2006) MANUFACTURED FROM BIS LICENSEE MANUFACTURER, WITH SPACER NIB (SMALL PROTRUDING PROFILES AND THE VERTICAL FACE OF OF A PAVER BLOCK USED AS A DEVICE FOR KEEPING MINIMUM JOINT GAP IN BETEEN THE PAVING BLOCKS, AS PER CL. NO. 3.26 OF IS : 15658) AND OF SPECIFIED SIZE AND SHAPE WITH ASPECT RATIA ( THE RATIO OF LENGTH TO THICKNESS OF A PAVER BLOCK, AS PER CL. NO. 3.3 OF IS : 15658) AS PER TABLE 2 PF IS : 15658WITH FLEXURAL STRENGTH / BREAKING LOAD AS PER ANNEXURE G OF IS : 15658, ON THE PREPARED BASE COURSE OF SPECIFIED CBR AS PER TABLE 1 OF IRC SP: 63 (2018) OR ELSE AS MENTIONED IN DESIGN AND DRAWING WITH A COUSION OF COMPACTED BEDDING SAND OF25-35MM THICK ( GRADING OF THE BEDDING SAND AS PER CLAUSE 6.5.1 OF IRC SP-63) AND FILLIN UP THE GAPS IN BETWEEN PAVER BLOCKS WITH JOINT FILLING SAND (THE GRADING OF THE SAND WILL BE AS PER CLAUSE 6.5.2 OF IRC SP-63)AND COMPLETING THE EDGES WITH CUT BLOCKS AS PERCL.NO. 8.7 OF IRC SP-63 (2018) WITH PROPER CONFINEMENTOF BEDDING AND JOINT FILLING SAND,COMPACTION , LEVELLING AND FILLING UP OF THE EDGE GAP. |
| 6 | Laying of interlocking Paver Blocks as per approved design over 20-30mm th medium yellow sand bed with true to line,lavelling,proper compaction with vibrator etc. with jointing with kerb/edge should be made with Cement Concrete (1:2:4)etc. as per the direction of the Engineer-in-charge and including cost of materials,labour etc. complete |
| 7 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand |
| 8 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 9 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES |
| 10 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge |
| 11 | Sub Total |
| 12 | GST 18% |
| 13 | CESS 1% Please Enable Macros to View BoQ information |