| 1 | Earth Work in excavation in all type of soil with dressing and disposal. i/c cost of material, labour,royalty, T&P etc including all taxes complete as directed by Engineer in charge |
| 2 | Supply/Providing, Laying, pitching and packing 20-40 kg.cut/split stone in mechanically woven double twisted Hexagonal shaped wiremesh gabion box/Crate of size 1.5 X 1.5 X 0.50m, mesh size 10cm X 12 cm,10 SWG G.I wire including all cost of labour material, and T&P etc with all taxes required for proper completion of work as per Engineer-in-charge. |
| 3 | Supply/Providing, pitching and packing 20-40 kg.cut/split stone on shank slope including all cost of labour material, and T&P etc with all taxes required for proper completion of work as per Engineer-in-charge. |
| 4 | Supply/Providing, filling of HDPE woven bags confirming to BIS No. 11652-2014 of cement bags size with local earth in nylon crate including laying in proper with loading, unloading and carriage i/c cost of material, labour, royalty, T&P etc complete as directed by Engineer in charge. |
| 5 | Supply/Providing of Silt/sand from river bed at river bank by Mud pump including stacking, T&P etc for proper completion of work. |
| 6 | Supply/Providing and laying of geotextile sheet made of 200 gsm woven multifilament with pegs including preparation of surface including all cost of labour, materials and T&P etc. complete |
| 7 | R.R Masonry in 1:4 Cement Mortar including cost of all material, labour, T&P and carriage etc. all complete. |
| 8 | Cement Concrete in 1:2:4 on Stone Masonry including cost of all material, labour, T&P and carriage etc. all complete. |
| 9 | Earth work in embankment by power transported earth with a lead up to 3 KM including excavation, loading, unloading, mannual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time of Govt. orders. |
| 10 | Providing and laying bricks (M-150) on edge pitching (kharanja) in sand including preparation of sub grade and filling joints with local sand including cost of sand, brick and all labour,T&P etc.required for proper completion of work. Please Enable Macros to View BoQ information |