|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum |
| 2 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification |
| 3 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9\\" X 43/8\\"X 2 3/4\\" including finishing, curing, etc., complete complying with standard specification |
| 4 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. |
| 5 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications |
| 6 | Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors. |
| 7 | Painting two coats for Interior surface with approved Interior Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. |
| 8 | Geology survey charges etc |
| 9 | Drilling of 6”dia vertical bore well in hard rock area using bore well rig including conveyance and erecting of rig and all labor charges etc |
| 10 | Upto to 150m Below ground Level |
| 11 | From 151m upto 180m |
| 12 | From 181m upto 210m |
| 13 | From 211m upto 240m |
| 14 | From 241m upto 270m |
| 15 | Supply and fixing of 200mm dia PVC casing pipe including cost of materials and all labour charges etc., |
| 16 | Supply and delivery of Submersible pumpset with motor confirm to isi803/4/89 with isi making as per standard specification for deep borewell or the duty condition of (250 m H x 100 lpm) provided the pump set should supplied with the 5m of flat submersible cable the pump set should be delivered at site including packing, transport extra complete. |
| 17 | Supply and delivery of Pvc &GI specials ncluding cost for materials and all labour charges for completed |
| 18 | Pannel board upto 7.50 H.P. |
| 19 | 4.00 Sqmm Submersible Cable |
| 20 | 40mm UPVC Pipe |
| 21 | 50mm GI coupling |
| 22 | 50mm GI Bend |
| 23 | 50mm GM NRV |
| 24 | Bore cover |
| 25 | Bore Kitty |
| 26 | 63mm Dia Pipe |
| 27 | Conveyance of pipe line including all cost and conveyance all cost etc |
| 28 | 63mm Dia Pipe |
| 29 | Refilling the Excavated Earth including all cost and conveyance Charges Etc |
| 30 | 63mm Dia Pipe |
| 31 | Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter torequired depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter,Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trailrun for 10 days. Please Enable Macros to View BoQ information |