| 1 | Footbridge construction |
| 2 | OD199028/2025-2026:RING BUND Ttpe-1: Putting up ring bund as per approved shape 2.5 m bottom width ,1m top width using empty gunny/polythene bags filled with earth placed in 2rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2000m including ...etc |
| 3 | OD199031/2025-2026:Bailing out water using 5 HP Pump-Bailing out water with 5 HP engine and Pump set including conveyance to site and erection , cost of fule , lubrication oil and other stores ,pay of staff ect. |
| 4 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth |
| 5 | 14.8:Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3 |
| 6 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 |
| 7 | 11.6.3.2:Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.III. Random Rubble Masonry (ii) In cement mortar 1:4 |
| 8 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 |
| 9 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 10 | 12.3:Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 |
| 11 | OD347163/2025-2026:CHERTHALA TALUK- Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (WITHOUT POWER ROLLER) |
| 12 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) Nominal mix (1:2:4) |
| 13 | OD349581/2025-2026:Tubular Steel Railing on Medium Weight Steel Channel (ISMC series) 100 mm x 50 mm <br> Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 m high above ground, 2 m centre-to-centre, complete as per approved drawings Clause 1706( BASED ON 10.14) Please Enable Macros to View BoQ information |