| 1 | Providing temporory ring bund to required lines, levels and shape with cement bags filled with filling sand and tied with coir yarn bottom width 2.7 m top width 1m and height 1.4 m as specified by the departmental officers at site for diverting water from working area, maintaining the bund free of leakage till the completion of work and removing the same after the completion of work with all leads and lifts including all cost of material, labour, conveyance, and all other incidental charges involved etc . |
| 2 | Bailing out water using 5HP engine and pump set including to and for conveyance, charges for erection, cost of fuel, lubricating oil , pay off staff and all other sundries etc. complete as per direction of the deparmental officers at site . |
| 3 | Engaging man mazdoor for bailing out water during the course of construction with all leads and lifts etc complete as directed by the departmental officers at site |
| 4 | Earth work excavation in all classes of soil (except hard/medium rock which required blasting) and using the spoil for forming embankment wherever necessary or depositing at places pointed out by the departmental officers with all leads and lifts including breaking clods, watering etc complete as per specification and the direction of departmental officers at site. |
| 5 | Providing dowel bars using 20 mm dia tor steel 2m long with a hook at top including drilling holes 25mm dia and 100cm deep and grouting with 0.5kg of cement including all cost of materials, labour charges for drilling holes, fixing in position etc complete with all leads and lifts as per specification and the direction of departmental officers at site |
| 6 | Cement Concrete 1:4:8( one cement,four sand and eight broken stones) using 40 mm (nominal size) broken stone including cost and conveyance of materials, labour charges for mixing and laying of concrete, watering, curing etc. complete with all leads and lifts as per specification and the direction of deparmental officers at site. (cement @171kg/m3 of concrete) |
| 7 | Reinforced Cement Concrete 1:2:4 (one cement,two sand and four broken stones) using 20 mm (nominal size) broken stones for belt including cost and conveyance of all materials hire and all labour charges for laying of concrete, formwork, watering, curing etc. complete but excluding reinforcement with all leads and lifts as per specification and the direction of deparmental officers at site. (cement @3.30kg/10dm3 of concrete) |
| 8 | Reinforcement for RCC work,using tor steel (TMT) bent,tied and placed in position (plain grill requiring bending cold) including cost and conveyance of all materials and labour charges etc.complete with all leads and lifts as per specification and the direction of departmental officers at site. |
| 9 | Cement Concrete 1:3:6( one cement,three sand and six broken stones) using graded metal (60% of 40mm and 40% of 20mm brokenstones) including all formworks,cost and conveyance of materials and labour charges for mixing and laying of concrete, watering, curing etc. complete with all leads and lifts as per specification and the direction of deparmental officers at site. (cement @223.2kg/m3 of concrete) |
| 10 | Dry rubble masonry for foundation and superstructure with good quality of blasted rubble including packing compact to lines and levels, cost and conveyance of all material,labour charges etc complete with all leads and lifts as per specification and the direction of departmental officers at site. |
| 11 | Cement concrete 1:3:6( one cement, three sand and six broken stone) using 20 mm( nominal size) broken stones including cost and conveyance of all materials hire and all labour charges for mixing and laying of concrete, watering, curing etc. complete with all leads and lifts as per specification and the direction of departmental officers at site.([email protected]/10dm3 of conrete) |
| 12 | Providing Poly Propylene Gabion net of size 1*1*0.5M including all cost and conveyance of materials and labour charges etc complete as per specification and the direction of departmental officers at site Please Enable Macros to View BoQ information |