| 1 | Construction of embankment with approved material obtained form borrow pits with a lift up to 1.50m, transporting to site spreading grading to required slop & compactiong to meet requirement of tables 300.1 and 300.2 with a lead up to 1000m Techincal Specification Cluase 301.5 (Including all taxes, LabourCess but excluding GST) |
| 2 | GSB Gr.-1 Construction of granular sub-base 10cm compacted thinckness by providing well graded material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including all taxes, material, LabourCess but excluding GST) |
| 3 | WBM-G2 (Inter coat)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification 10cm compacted thinckness including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 KN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-2 as per Technical Specification Clause 405 (Including all taxes, material, Royalty, LabourCess but excluding GST) |
| 4 | WBM-G3 (Top Coat)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification 7.5cm compacted thinckness including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405, LabourCess but excluding GST) |
| 5 | Brick edging on both side of the S.O.B Brick 8cm wide and 12cm deep laid with mud mortar all labour finished to required template and in proper alignment and also including and ramming the excavated earth including all labour, T&P sundries required for proper completion of work |
| 6 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.80kg/sqm using mechanical means as per Technical Specification Clause 502 (Including all taxes, material, LabourCess but excluding GST) |
| 7 | Providing and applying tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per Technical Specification Clause 503 (Including all taxes, material, LabourCess but excluding GST) |
| 8 | Providing, laying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen VG-10 required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Specification Clause 508 (Including all taxes, material, LabourCess but excluding GST) |
| 9 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (Including all taxes, material, LabourCess but excluding GST) |
| 10 | Earth work excavation for structurs as per drawing and technical specification clause 305.1 including setting out construction of shoring and bracing removal of stumps and other deleterious materials and disposal up to a lead 50m dressing of sides |
| 11 | Providing concrete for plain/rainforced concrete M10(1:3:6) in open foundation. Complete as per drawing and technical specificaton clause 802, 803 1202 & 1203 |
| 12 | Brick masonary work in cement mortar in fondation complete excluding pointing and plastering as per drawing and technical specification clause 600, 1202 & 1203 (1.3) |
| 13 | Brick masonary work in cement mortar in Sub structure complete excluding pointing and plastering as per drawing and technical specification clause 600, 1202 & 1203 (1.4) |
| 14 | Poviding and laying filter media with Granular crushed aggregate (63-45 mm size st ballast) as per specification to a thickness of not less than 600mm/300mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment wing |
| 15 | Rainforced cement concrete in substructure complete as per drawing and technical specification clause 802 1202 and 1204 RCC grade M-20 (nominal mix) |
| 16 | Plain/reinforced cement concrete in substucture complete as per drawing and technical specification clause 802, 804,805,806,807,1202 and 1204 RCC grade M-25 (nominal mix) |
| 17 | Suplying fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawing and technical specification clsuse 1002,1005.1010 and 1202 |
| 18 | Providing wepholes in brick masonry /stone masonry. Plaing/reinforced concrete abutment wing wall. Return wall with 100mm dia AC pipe extending through the full with of the structure with slope of 1(v):20(H) towards drawing face complete as per drawing |
| 19 | Pointing wihth cement (1:3) on brick work as per drawing and technical specification clause 613.3 and 1204 |
| 20 | Construction of embankment with approved soil with a lift upto 1.5 laying in layers. Breaking clods. Dressing to required lines, curves, grade and sections watering and compaction to meet requiredment of table 300.1 and 300.2 |
| 21 | Plastering with cement mortar (1:4) 15 m thick on brickwork in substructure as per technical specification |
| 22 | Plainting two coats including prime coat with epoxy paint of approved brand on cencrete /steel surfaces after through cleaning of surface to give an even shade as per drawing and technical specification clause 1701 |
| 23 | Boring holes to be used for dewatering |
| 24 | dewatering |
| 25 | 1st Year Maintenance Charge@0% of BOQ Cost |
| 26 | 2nd Year Maintenance [email protected]% of BOQ Cost |
| 27 | 3rd Year Maintenance [email protected]% of BOQ Cost |
| 28 | 4th Year Maintenance [email protected]% of BOQ Cost |
| 29 | 5th Year Maintenance Charge@3% of BOQ Cost Please Enable Macros to View BoQ information |