| 1 | Construction of embankment with approved material obtained form borrow pits with a lift up to 1.50m, transporting to site spreading grading to required slop & compactiong to meet requirement of tables 300.1 and 300.2 with a lead up to 1000m Techincal Specification Cluase 301.5 (Including all taxes, LabourCess but excluding GST) |
| 2 | GSB Gr.-1 Construction of granular sub-base 10cm compacted thinckness by providing well graded material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including all taxes, material, LabourCess but excluding GST) |
| 3 | WBM-G2 (Inter coat)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification 10cm compacted thinckness including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 KN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-2 as per Technical Specification Clause 405 (Including all taxes, material, Royalty, LabourCess but excluding GST) |
| 4 | WBM-G3 (Top Coat)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification 7.5cm compacted thinckness including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405, LabourCess but excluding GST) |
| 5 | Brick edging on both side of the S.O.B Brick 8cm wide and 12cm deep laid with mud mortar all labour finished to required template and in proper alignment and also including and ramming the excavated earth including all labour, T&P sundries required for proper completion of work. |
| 6 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg/sqm using mechanical means as per Technical Specification Clause 502 (Including all taxes, material, LabourCess but excluding GST) |
| 7 | Providing and applying tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per Technical Specification Clause 503 (Including all taxes, material, LabourCess but excluding GST) |
| 8 | Providing, laying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen VG-10 required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Specification Clause 508 (Including all taxes, material, LabourCess but excluding GST) |
| 9 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (Including all taxes, material, LabourCess but excluding GST) |
| 10 | Construction of Pateries on both side of the road with approved material obtained form borrow pits with a lift up to 1.50m, transporting to site spreading grading to required slop & compactiong to meet requirement of tables 300.1 and 300.2 with a lead up to 1000m Techincal Specification Cluase 301.5 (Including all taxes, LabourCess but excluding GST) |
| 11 | Providing & laying Hume Pipe culvert @350mm dia |
| 12 | 1st Year Maintenance Charge@0% of BOQ Cost |
| 13 | 2nd Year Maintenance [email protected]% of BOQ Cost |
| 14 | 3rd Year Maintenance [email protected]% of BOQ Cost |
| 15 | 4th Year Maintenance [email protected]% of BOQ Cost |
| 16 | 5th Year Maintenance Charge@3% of BOQ Cost Please Enable Macros to View BoQ information |