| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : 1 meter from cutting edge |
| 2 | 25 meter beyond 1m from cutting edge |
| 3 | 50 meter beyond 1m from cutting edge |
| 4 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 5 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 6 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil: |
| 7 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil: |
| 8 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material :All kinds of soil : |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 10 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : |
| 11 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 12 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge |
| 13 | Dumping stone excluding cost of stones.in Horizontal on level |
| 14 | Supply of Stone boulder (nallah) nominal size 225 mm |
| 15 | Collection and extraction of Nallah boulders by manual labours within a lead of 150m at different pockets of Nallah incl. Loading and stacking. |
| 16 | Filling of empty cement bags with earth/sand /stone dust including cost of sewing and strings but excluding cost of earth/sand/stone dust and bags at designated sites /locations in the jurisdiction of FSC Sub –Division Singhpora as directed by Engineer in Charge. |
| 17 | Supply and stacking of sand at designated dumping sites in the jurisdiction of FSC sub Division Singhpora as directed by Engineer -in-charge , including loading unloading and stacking ,Complete job. |
| 18 | Supply and stacking of stone dust at designated dumping sites in the jurisdiction of FSC sub Division Singhpora as directed by Engineer -in-charge , including loading unloading and stacking ,Complete job. |
| 19 | Hiring 01 NO.vehicle including driver for the Site visits within jurisdiction of sub division Singhpora including POL. |
| 20 | Dry stone pitching (any thickness) excluding cost of stones. On Horizontal |
| 21 | On Top copings of banks |
| 22 | On Slopes |
| 23 | Dry stone pitching, 225mm thick, including cost of stones andpreparation of surface. Quarry stone |
| 24 | Nallah stone |
| 25 | Opening out old wire crates those and re-binding after filling. |
| 26 | Loading /unloading sand /earth filled bags in lorries, lead upto 50m. |
| 27 | Placing of Earth/stone dust in bags.In Dry |
| 28 | in Wet |
| 29 | Supply and stacking of Good Earth at designated dumping sites in the jurisdiction of FSC sub Division Singhpora as directed by Engineer -in-charge including loading unloading and stacking ,Complete job. |
| 30 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah |
| 31 | Lime mortar 1:1:1 (1 Lime putty: 1 Surkhi: 1 Fine sand) Quarry |
| 32 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Quarry |
| 33 | Nallah |
| 34 | Supply /Engagement of Labours equipped with spades ,shovels, pick Axes etc. for Excavation /Removal of Rubbish/Blockades/ slush / Bushes including its disposal and the like as per directions of Engineeer -in -charge at designated sites inte Jurisdiction of FSC Sub Division Singhpora |
| 35 | Fitter |
| 36 | Blacksmith 2nd class |
| 37 | Mason |
| 38 | Carpenter |
| 39 | Painter |
| 40 | Engagement of Hydraulic Excavator(3D) including cost of services of operating staff, cost of lubricating oil, diesel/petrol/kerosene oil, other consumables for running the plant and machinary for Removal of obstructions / Removal of Building Material from Embankments and like at Designated sites as Directed by Engineer -in INCHARGE at the site with driver and fuel at selected reaches as directed by Engineer-in-Charge at site in the jurisdiction of Sub Division Singhpora (idle Charges). |
| 41 | Engagement of Hydraulic Excavator(3D) including cost of services of operating staff, cost of lubricating oil, diesel/petrol/kerosene oil, other consumables for running the plant and machinary for Removal of obstructions / Removal of Building Material from Embankments and like at Designated sites as Directed by Engineer -in INCHARGE at the site with driver and fuel at selected reaches as directed by Engineer-in-Charge at site in the jurisdiction of Sub Division Singhpora (Running Charges). |
| 42 | Engagement of poklain (chain mounted )including cost of services of operating staff, cost of lubricating oil ,diesel/kerosene oil ,other consumable for running the plant and machinery in selected reaches in the jurisdiction of FSC sub division Singhpora as directed by Engineer-incharge, complete job.(Idle charges) |
| 43 | Engagement of poklain (chain mounted )including cost of services of operating staff, cost of lubricating oil ,diesel/kerosene oil ,other consumable for running the plant and machinery in selected reaches in the jurisdiction of FSC sub division Singhpora as directed by Engineer-incharge, complete job. (Running Charges) |
| 44 | Enagagement of tipper including cost of services of operating staff ,cost of lubricating oil ,diesel /petrol /kerosene oil, other consumables for running the plant and machinery for operation at designated sites as directed by Engineer -in - charge in the juridiction of FSC sub division Singhpora (Idle Charges) |
| 45 | Enagagement of tipper including cost of services of operating staff ,cost of lubricating oil ,diesel /petrol /kerosene oil, other consumables for running the plant and machinery for operation at designated sites as directed by Engineer -in - charge in the juridiction of FSC sub division Singhpora ( Running Charges) |
| 46 | Engagement of Tractor including cost of services of operating staff , cost of lubricating oil, diesel/petrol/kerosene oil ,other consumables for facilitating execution of Flood Mitigation works as directed by Engineer-incharge in the jurisdction of FSC Sub division Singhpora ( Idle Charges) |
| 47 | Engagement of Tractor including cost of services of operating staff , cost of lubricating oil, diesel/petrol/kerosene oil ,other consumables for facilitating execution of Flood Mitigation works as directed by Engineer-incharge in the jurisdction of FSC Sub division Singhpora (Runnig Charges) |
| 48 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 30 cm girth upto and including 60 cm girth. |
| 49 | Beyond 60 cm girth upto and including 120 cm girth. |
| 50 | Providing and Laying PVC Polythene of special quality with all carraige complete job |
| 51 | Supply of A4 Paper 75 GSM paper for Sub divisional Use |
| 52 | Supply of A3 Paper 75 GSM paper for Sub divisional Use |
| 53 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Welded |
| 54 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. |
| 55 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. |
| 56 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Dry |
| 57 | Providing popular timber bollards, sufficiently straight, with a diameter of 10cm to 15cm, a length of 2.5m, and a conical bottom. This includes driving the piles at the site using mechanical/manual means, and all modes of transportation to complete the job as per the department's requirements. |
| 58 | Supply of Wooven Crate mesh of 4mm G.I Guage and 100mmx100mm mesh of standard Quality and Manufacture for resistance / Liability of crates which shall have to provide before start of work. |
| 59 | Supply of black ink for Epson/brother or any othe brand of printer. |
| 60 | Supply of colour ink for Epson/brother or any other printer |
| 61 | Engagment of Boat along with Boatman and other helping staff as required during execution of work at designated sites by Engineer -incharge in Jurisdiction of FSC Subdivision Singhpora |
| 62 | Engagment of wood cutter ,inclusive of all necessary tools and equipment such as machine cutters,axes, ropes machine fuel ,etc for smooth operation as per requirement of Department. |
| 63 | Supply of Mineral water during Floods |
| 64 | Supply of tea/Kehwa |
| 65 | Supply of biscuit pocket |
| 66 | Supply of Chicken/mutton Biryani (half) |
| 67 | Cutting charges of mild steel pipes/plates including cost of consumables, Extra but excluding the cost of transportation charges of equipment to site: Using Grinder |
| 68 | Using Gas Cutting |
| 69 | Welding charges of prepared mild steel sections, extra including cost of consumables but excluding cost of transportation charges of equipment to site: By Electric Welding |
| 70 | By Gas Welding |
| 71 | Providing of Grease (all purpose type ) Confirming to IS 7623 of approved marks -Indian oil. Castrol etc |
| 72 | Mechanical Transportation, loading, unloading, and handling of various items such as pump parts, motors, starters, welding tools and appropriate means of Transport.Private Car, Auto Rickshaw or similar with 01 km lead |
| 73 | Extra Per km of lead > 1km upto 5 km |
| 74 | Extra Per km of lead > 5km upto 10 km |
| 75 | Head load carriage of machinery/ equipment at locations in accessable by Vehicles on planes/rough terrain Upto 50Kg Load |
| 76 | Extra for every 50kg load |
| 77 | Extra for Uphill terrain (Ground slope >=07) |
| 78 | Carraige of materials from source to road site of work by mechanical transport incl. Loading un loading and stacking. Earth upto 1 km |
| 79 | Beyond 5 Km upto 10 km /km |
| 80 | Beyond 10 Km upto 20 km /km |
| 81 | Beyond 20 km /every additional Km |
| 82 | Crates upto 1 km |
| 83 | Beyond 5 Km upto 10 km /km |
| 84 | Beyond 10 Km upto 20 km /km |
| 85 | Beyond 20 km /every additional Km |
| 86 | Boulder / Stone upto 1 km |
| 87 | Beyond 5 Km upto 10 km /km |
| 88 | Beyond 10 Km upto 20 km /km |
| 89 | Beyond 20 km /every additional Km |
| 90 | Carriage of empty cement bags by mechanical transport from Divsional store Narbal to Designated sites in the jurisdiction of Singhpora incl. Loading unloading and stacking avg lead of 01kms |
| 91 | Beyond 5 Km upto 10 km /km |
| 92 | Beyond 10 Km upto 20 km /km |
| 93 | Beyond 20 km /every additional Km |
| 94 | Carraige of materials from source to actual site of work by mechanical transport incl. Loading un loading and stacking. Sand / stone dust avg. Lea d of 1 km |
| 95 | Beyond 5 Km upto 10 km /km |
| 96 | Beyond 10 Km upto 20 km /km |
| 97 | Beyond 20 km /every additional Km |
| 98 | Carriage of Material from Road site to actual site of work by Manual Labour, including loading, unloading and stacking,.Earth for first 50 mtrs. |
| 99 | for every additional 50 mtrs |
| 100 | Boulders / stone for first 50 mtrs. |
| 101 | for every additional 50 mtrs |
| 102 | Bags for first 50 mtrs. |
| 103 | for every additional 50 mtrs |
| 104 | for every additional 50 mtrs |
| 105 | Sand / stone dust for first 50 Mtrs |
| 106 | for every additional 50 mtrs |
| 107 | Add cost of EC bags supplied by the Deptt. Please Enable Macros to View BoQ information |