| 1 | (A) S.H. EARTH WORK Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil |
| 2 | Supplying and filling in plinth, under floor, foundations etc. With sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. |
| 3 | (B) S.H. CONCRETE WORK Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering- (A). All work upto plinth level: (i) 1:4: 8 (1 cement :4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size). |
| 4 | (C) S.H. REINFORCED CEMENT CONCRETE WORK Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement. -All work upto plinth level: (i) 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) |
| 5 | Reinforced cement concrete work in beams, suspendedfloors, roofs having slope upto 15° landings, balconies,shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases upto floor five levelexcluding the cost of centring, shuttering, finishing andreinforcement- (i) 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size ) |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement- (i) 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size ) |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (i) Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 8 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (i) Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 9 | Centering shuttering including struttings, propping etc. and removal of form work for: (i) Foundations, footings, bases for columns etc. for mass concrete with timber plank |
| 10 | ii) Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank |
| 11 | (iii) Columns, Pillars, Piers, Abutments, Posts and Struts with shuttering ply |
| 12 | (D) S.H. BRICK WORK 10 First class brick work in foundation and plinth including cost of all materials as required complete: (i) In cement mortar 1:6 ( 1 cement : 6 fine sand ) |
| 13 | Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete: (i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). |
| 14 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:- (i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). |
| 15 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. all complete. (i) Fixed to openings /wooden frames with rawl plugs screws etc. |
| 16 | 12 mm cement plaster of mix (i) In cement mortar 1 : 6 ( 1 cement : 6 fine sand ) |
| 17 | 12 mm cement plaster of mix (i) In cement mortar 1 : 4 ( 1 cement : 4 fine sand ) |
| 18 | Neat cement punning. |
| 19 | Finishing walls with acrylic smooth exterior paint of required shade of approved brand and manufacture [Payment shall be made after submission of Test Certificate issued by the Manufacturer] : New work ( two or more coats applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 20 | Applying priming coat with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content [Payment shall be made after submission of Test Certificate issued by the Manufacturer]. (i) With ready mixed red oxide zinc chromatic on steel/ iron works having VOC content less than 250 grams/litre. |
| 21 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade [Payment shall be made after submission of Test Certificate issued by the Manufacturer]: (i) Two or more coats on new work |
| 22 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil Please Enable Macros to View BoQ information |