|
| 1 | Name of Work: Construction of Open Well and Supplu and erection of Submersible Pumpset with Pannel Board and laying of Pipe Line in Panchanthirthi at Kunnapattu Panchayat in Thiruporur Panchayat Union in Chengalpattu District for the Year 2025-26 having Package No .01/2025-26 |
| 2 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Hard Clay, Stiff black cotton soil, Hard red earth, Shales, Murram, Gravel, Stoney earth, and earth mixed with small size boulders etc. 1st depth |
| 3 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Soft disintegrated rock, laterite, Soft rock or Kankar not requiring blastering etc complete.2nd depth |
| 4 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Medium rockand Dence Medium rock not requiring blasting etc complete. 3rd depth |
| 5 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Medium rockand Dence Medium rock requiring blasting etc complete. 4th depth6.00 - 8.00m |
| 6 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Medium rockand Dence Medium rock requiring blasting etc complete. 5th depth 6.00 - 8.00m |
| 7 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Medium rockand Dence Medium rock requiring blasting etc complete. 6th depth 12.00 -14.00m |
| 8 | CC1:4:8 using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc complete |
| 9 | Centring charges for all R.C.C. works including cost and conveyance and al other labour charges etc complete. |
| 10 | Supplying and fabrication of Mild steel including cost and conveyance and all other labour charges etc complete. |
| 11 | Reinforced Cement Concrete 1:11/2:3 mix using 20mm ISS HBG metal including cost and conveyance and all other labour charges etc complete |
| 12 | RR Masonary in Cement Morter 1:5 mix using rough stone including cost and conveyance and all other labour charges etc complete |
| 13 | Plastering with CM 1: 4 20mm thick including cost and conveyance and all other labour charges etc complete |
| 14 | Pipe line : Earth work excavation for Pipe Laying worksas per SS20B for all soil. |
| 15 | Towards cost and supply of 90mm OD PVC Pipe True Bore/ Basant/ Vimal make |
| 16 | Labour charges for laying and jointing 90mm& 63mm OD PVC pipe |
| 17 | Refilling with Excavated Earth including all labour charges etc. |
| 18 | Supply and delivery of 5HP submersible pump set discharge 175m & LPM for 150mm dia bore well |
| 19 | Supply and delivery of control pannel board suitable for 3phase submersible motor |
| 20 | Supply and delilvery of 80mm HD hose pipe |
| 21 | Supply and laying of 3core 4sqm submersible flate cable |
| 22 | Erection charges for submersible pumpset including all labour charges |
| 23 | Providing Kiosk of size 75x45x75cm made up of gi sheet of 16 guade with locking arrangements |
| 24 | GST Amount for providing Service to Government Contract Works for the above Construction Works.{GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |