| 1 | Part A: 3.3 kV, 03 wire Overhead line Erection of metallic pole of above 10.0m and upto 13.0 m in brick /boulder /stone foundation including excavation and refilling etc. as required |
| 2 | Transportation of Poles from Road Side to Pole Pit for lead of 1KM |
| 3 | Shifting of Other Materials to Pole Pit |
| 4 | Stringing of ACSR Dog Conductor Three Conductor |
| 5 | Supplying and erection of stay set complete (galvenised) with 19/ 20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5mm thimble, stay clamps, turn buckle (20 mm X 60 cm ), 7/ 4.00 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand: 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required.. |
| 6 | Supply and Erection of 11 KV Pin Insulator complete with large steel head GI Pin Nuts Washers etc as required. |
| 7 | Supplying & Erection of 11 KV Disc Insulator for 11 KV Overhead Line with Galvanized fittings ball and socket type and complete with Galvanized Strain Clamps, Bolts, Nuts and Washer etc as required. |
| 8 | Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per meter) pole top bracket/ cross arm for single 11 KV over head line conductor complete with 50 mm X 6 mm flat iron clamp, bolts, nuts and washers including drilling holes for insulator pins, bolts and nuts etc. and painting with primer and finish paint as required. |
| 9 | Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per meter) V shape cross arm for Two 11 KV over head line conductor complete with 50 mm X 6 mm M.S. flat iron clamp, bolts, nuts including drilling holes for insulator pins, bolts, nuts and washers etc. ( as per drawing ) and painting with primer and finish paint as required. |
| 10 | Erection of pole top/ straight two wire/ V shape two wire, angle iron/ channel iron, cross arm on steel tubular/ rail/ PCC pole for 11/22/33 KV as required. |
| 11 | Supplying of two lengths of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per meter) double pole cross arm for three wire 11KV over head line conductors complete with through bolts and nuts for clamping to the poles, 50 mm X 6 mm M.S. flats welded on one side to the channel iron and with bolts and nuts on the other side for tying the cross arms together, including drilling holes for insulator pins/ fittings, bolts, nuts and washers etc. (as per drawing) and painting with primer and finish paint as required. |
| 12 | Erection of double pole 3 wire cross arm for 11/22/33 KV OH lines as required. |
| 13 | Supply of 6 SWG GI Wire for earth continuity. |
| 14 | Supply of 8 SWG GI Wire for cradle guards. |
| 15 | Running Earth 6 SWG Wire |
| 16 | Erection of cradle guards. |
| 17 | Dismantling of Pole / Street Light Standard / Strut embedded in Cement Concrete Foundation etc |
| 18 | Dismantling of Overhead Lines Comprising Copper / Aluminium Overhead Conductor GI Wire Cross Arms Insulators etc . |
| 19 | Part B: 440 V/230 V, 03/04/05 wire Overhead line Erection of metallic pole of above 10.0m and upto 13.0 m in brick /boulder /stone foundation including excavation and refilling etc. as required |
| 20 | Transportation of Poles from Road Side to Pole Pit for lead of 1KM |
| 21 | Shifting of Other Materials to Pole Pit |
| 22 | Stringing of ACSR Rabbit Conductor Three Conductor |
| 23 | Supplying and erection of stay set complete (galvenised) with 19/ 20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5mm thimble, stay clamps, turn buckle (20 mm X 60 cm ), 7/ 4.00 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand: 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required.. |
| 24 | Supplying and erection of 100 mm × 110 mm shackle insulator with G.I. bolts, nuts and straps etc. as required. |
| 25 | Supplying and erection of 100 mm × 65 mm pin insulator complete with G.I. spindle and nuts etc. as required. |
| 26 | Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per meter) cross arm for 4 wire over head line complete with clamps, bolts, nuts and washer etc. including drilling of holes for insulator pins etc. (as per drawing) and painting with primer and finished paint as required. |
| 27 | Supply of 6 SWG GI Wire for earth continuity. |
| 28 | Supply of 8 SWG GI Wire for cradle guards. |
| 29 | Running Earth 6 SWG Wire |
| 30 | Erection of cradle guards. |
| 31 | Earthing with G.I. earth pipe 3 metre long, 40 mm dia including accessories like reducer funnel etc, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. (Charcol - 64 Kg , salt - 5 kg , Brick - 50 nos. , cement & sand as required). |
| 32 | Providing and fixing 200 A TP & N disconnector fuse switch unit inside the existing panel board with ISI marked HRC fuses including drilling holes in cubicle panel, making connections, etc. as required |
| 33 | Dismantling of Pole / Street Light Standard / Strut embedded in Cement Concrete Foundation etc |
| 34 | Dismantling of Overhead Lines Comprising Copper / Aluminium Overhead Conductor GI Wire Cross Arms Insulators etc . |
| 35 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |