|
| 1 | Item Wise BoQ 15.0 BoQ_Ver3.0 Item Wise Normal INR Only INR Select, Excess (+), Less (-) Tender Inviting Authority: CHIEF ENGINEER (Gen.), ATPS, MPPGCL, Chachai Name of Work: Work contract for overhauling work of various crane / hoists of 210 MW Unit No.5, ATPS MPPGCL Chachai Contract No: 2026_MPPGC_487934 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(DOMESTIC TENDERS - RATES ARE TO GIVEN IN RUPEES (INR) ONLY)(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Work Description Item No. Quantity/ Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC Unit RATE WITHOUT TAXin Rs. Unit P& F Chargesin Rs. Offered Quantity SAC CODE BASIC RATE inclusive of P&F Chargescol (10) = (6) + (7)inRs. IGST Rate on col (6)in % IGST Amount for total period col (9) = (4)x(6) x (8)inRs. CGST Rate on col (6)in % CGST Amount for total period col (11) = (4(x(6) x (10)in Rs. SGST Rate on col (6)in % SGST Amount for total periodcol (13) = (4)x(6) x (12)in Rs. Freight Charges (Unloading & Stacking)in Rs. IGST Rate on Freight Chargesin % IGST Amount on Freight Chargescol (19) = (17) x (18)in Rs. CGST Rate on Freight Chargesin % CGST Amount on Freight Chargescol (21) = (17) x (20)in Rs. SGST Rate on Freight Chargesin % SGST Amount on Freight Chargescol (23) = (17) x (22)in Rs. Amount towards Any Other Duties/ Leviesin Rs. Total FOR Destination Amount for Offered Quanitycol (25) = (8) X (27)in Rs. TOTAL AMOUNT Without Taxescol (15) = (4) x (6) inRs. P Total Amount with taxes (IN Rs.) (16)=sum (9),(11),(13),(14), (15) TOTAL AMOUNT In Words (in Rs.) |
| 2 | Complete Overhauling of Mill bay CraneCapacity 12.5 Ton, make SWIFT |
| 3 | Complete Overhauling of PA Fan MotorHoist Capacity 10 Ton, Make ARMSEL |
| 4 | Complete Overhauling of FD Fan side Hoist Capacity 2.5 Ton, Make ARMSEL |
| 5 | Complete Overhauling of FD Motor sideHoist Capacity 2.5 Ton, Make ARMSEL |
| 6 | Complete Overhauling of ID Fan MotorHoist Capacity 12 Ton, Make ARMSEL |
| 7 | Complete Overhauling of AHP HoistCapacity 2 Ton, Make ARMSEL |
| 8 | Complete Overhauling of ESP HoistCapacity 10 Ton, Make ARMSEL |
| 9 | Complete Overhauling of Vacuum PumpHouse (AHP) Crane Capacity 7.5 Ton, Make GRIP |
| 10 | Complete Overhauling of Ash Slurry PumpHouse (AHP) Crane Capacity 5 Ton, Make GRIP |
| 11 | Complete Overhauling of Clarifier PumpHouse (AHP) Capacity 5 Ton, Make GRIP |
| 12 | Complete Overhauling of Water RecoveryPump House (AHP) Crane, Capacity 3 Ton, Make GRIP |
| 13 | Complete Overhauling of Silo (AHP) HoistCapacity 2 Ton, Make GRIP |
| 14 | Complete Overhauling of Fire Fighting Pump House Crane Capacity 5 Ton, Make REVA |
| 15 | Complete Overhauling of CompressorBuilding Crane Capacity 5 Ton, Make REVA |
| 16 | Complete Overhauling of CW Pump HouseCrane Capacity 30 Ton, Make ANUPAM |
| 17 | Complete Overhauling of Chlorination PlantHoist Capacity 3 Ton, Make SWIFT |
| 18 | Complete Overhauling of Store BuildingCrane Capacity 2 Ton, Make SWIFT Total in Figures 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Item30 Select % 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |