| 1 | APPENDIX A-Site Clearing & Levelling |
| 2 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area |
| 3 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m |
| 4 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br> |
| 5 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications |
| 6 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 7 | 8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces |
| 8 | OD255208/2025-2026:Using 1 cubic meter capacity bucket excavator for removing all kind of unauthorized materials from road. |
| 9 | APPENDIX B- BADMINTON COURT & OPEN GYM |
| 10 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 11 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 12 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 13 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 14 | OD254342/2025-2026:Synthetic Acrylic Sports Flooring for Outdoor 3 mm thick including material & labour charge |
| 15 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete |
| 16 | 16.70.2:Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts , bolts and washers as required complete as per the direction of Engineer-in- charge.Made of G.I wire of dia 4 mm. PVC coated to achieve outer dia. not less than 5 mm in required colour and shade |
| 17 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 18 | OD348418/2025-2026:Providing and fixing Air Walker including all costs of materials, conveyance, laying, labour charges etc complete as per the direction of departmental officers. |
| 19 | OD348419/2025-2026:Providing and fixing Skier including all costs of materials, conveyance, laying, labour charges etc complete as per the direction of departmental officers. |
| 20 | OD348420/2025-2026:Providing and fixing Seated chest Press & Seated Leg Press including all costs of materials, conveyance, laying, labour charges etc complete as per the direction of departmental officers. |
| 21 | OD348423/2025-2026:Providing and fixing Bridge Ladder including all costs of materials, conveyance, laying, labour charges etc complete as per the direction of departmental officers. |
| 22 | OD348424/2025-2026:Providing and fixing Rower Machine including all costs of materials, conveyance, laying, labour charges etc complete as per the direction of departmental officers. Please Enable Macros to View BoQ information |