Name of Work:- Annual Plan-Karakurussi gp 2025-26,Project No.326/25-26-Renovation of drinking water schemes in Ward 13-General Civil Work
Sl. No.
Item Description
1
Drinking water scheme
2
OD442756/2025-2026:Supplying and fixing of open well type centrifugal pump set with all fittings, suctionand delivery pipe,panelboard volt meter,ammeter,indicator lamp,non return valve, etc. complete
3
51.18.12.6:Providing and fixing G.I. pipes complete with G.I. fittings (Cost of fittings to be paid separately) <br> External work - 50 mm nominal dia
4
50.18.7.3.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 25 mm dia 10Kgf/ cm2- Internal work- Exposed on wall
5
OD444298/2025-2026: OD215768/2025-2026 Supply and errection of Ferro cement pump house as per following specifications.a) Foundation of size 1.60x1.60x0.60m ferro cement square fitting by earth consolidation connecting using cement concrete 1:4:8, b) Ferro cement ready made wall of size 1.50x1.50m (square type) having an averagethickness of 25mm and height 2.10m, c) Ferro cement ready made triangular type roof d) M.S. door with necessary fittings 90x210cm size painting with synthetic enamel paint two coat after a priming coat includingf supplying a pad lock e) M.S. ventilator with grill of size 0.90xo.40m, painting with synthetic enamel paint two coat after a primary coat f) white washing two coat with cement proof paint two coat on inside and outside of pump house including roof
6
2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock
7
OD525667/2025-2026:Extra for every additional lift 1.5 m or part there of 6.00 - 7.50 in excavation / banking excavated or stacked materials. Ordinary or hard rock
8
OD525666/2025-2026:Extra for every additional lift 1.5 m or part there of 7.50- 9.00 in excavation / banking excavated or stacked materials. Ordinary or hard rock
9
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
10
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
11
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural sources derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources derived from natural sources) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.