| 1 | Appendix I - pump house |
| 2 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 3 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 4 | OD5849/2025-2026:Modified old data 60.64.1 Coconut Pile - Supplying and stacking well matured straight coconut post fordriving down throug various strata bellow bed level including cost coveyancelabour charges etc complete |
| 5 | OD5851/2025-2026:Modified old 60.64.4 Coconut Pile - Driving down coconut pile to lines and levels through variuosstrata including all hire charges and labour for fixing , staging platform and allother appliances necessary for pile driving down after pointing the bottom end Details for one post of 8m long |
| 6 | OD5848/2025-2026:Filling with Quarry MuckFilling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade (51.2.3) |
| 7 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 8 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 9 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 10 | OD5847/2025-2026:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more with minimu boat load |
| 11 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 12 | OD5850/2025-2026:Modified olf 50.2.26.1Filling using excavated earth (excluding rock) in open areas in layers notexceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up |
| 13 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete |
| 14 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) |
| 15 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer |
| 16 | 13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm) |
| 17 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete |
| 18 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete |
| 19 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 20 | 12.50:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
| 21 | 12.4.1:Providing ridges or hips width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete.0.80 mm thick with zinc coating not less than 275 gm/m2 |
| 22 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 23 | Appendix II -Parakuzhy |
| 24 | OD5858/2025-2026:Putting up ring bund to a bottom width of 3m, top width of 1m, height of 2m and side slopes1/2:1 by driving down half split coconut posts 3m long to a depth of 1.5m below ground level at 0.75 C/C in two rowsand fixing 1/4th split coconut wailing pieces in 3 rows and connecting the posts with 1/4th split cross ties, bambooreepers for tying, screening and filling inside with clay maintain the bund till the completion of the work and removingthe same after etc. complete (Boat load upto 3 km) |
| 25 | OD5854/2025-2026:Modified old 60.2.3 Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water withengine and pump set above 5HP and up to 10HP, including conveyance to siteand erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete |
| 26 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 27 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil |
| 28 | OD5855/2025-2026:Modified old data 60.64.1 Coconut Pile - Supplying and stacking well matured straight coconut post fordriving down throug various strata bellow bed level including cost coveyancelabour charges etc complete |
| 29 | OD5853/2025-2026:Modified old 60.64.4 Coconut Pile - Driving down coconut pile to lines and levels through variuosstrata including all hire charges and labour for fixing , staging platform and allother appliances necessary for pile driving down after pointing the bottom end Details for one post of 8m long |
| 30 | OD5852/2025-2026:Modified old 60.7.2 DR PACKING Under foundation - Dry stone packing under foundation with goodquality blasted rubble including conveyance of material and labour charges etc.complete as per direction of departmental officers at site. |
| 31 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 32 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 33 | OD5856/2025-2026:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more with minimu boat load |
| 34 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 35 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 36 | OD5857/2025-2026:Modified olf 50.2.26.1<br>Filling using excavated earth (excluding rock) in open areas in layers notexceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up Please Enable Macros to View BoQ information |