|
| 1 | Cleaning of work site, dismantling the old structures, demolishing the existing civil structure and providing concrete for fixing new embedded parts etc. |
| 2 | OD41705/2025-2026:Clearing grass from banks of canal and removal of silt, zoological waste and other debris from canal bed including removal of the rubbish up to a distance of 50 m outside the periphery of thearea cleared. |
| 3 | OD41704/2025-2026:Dismantling of the Canal Shutter ( Up to 2 Tonne weight ) / Hoisting Unit / Embedded parts etc. of the same and stacking at a distance of 100 meter including hire of machinery, labour etc. complete as directed by the departmental officer at the site.(Weight of the unserviceable shutters and embedded parts may be calculated as 60% and unserviceable hoisting units as 80 % ) |
| 4 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. |
| 5 | OD41707/2025-2026:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges |
| 6 | OD41708/2025-2026:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges |
| 7 | OD41706/2025-2026:Supply of MS round bar including cost of conveyance charges |
| 8 | OD41702/2025-2026:Fabrication and erection of Embedded parts and accessories for canal shutter as per approved specifications, drawings and directions of deptl officer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied |
| 9 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 10 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts |
| 11 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 12 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3graded stone aggregate 20 mm nominal size derived from natural sources) |
| 13 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete |
| 14 | OD41721/2025-2026:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. |
| 15 | OD41720/2025-2026:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection, cost of fuel, lubrication oil and other stores, pay of staff etc complete |
| 16 | Supply, Fabrication & Painting of new shutters |
| 17 | OD41712/2025-2026:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges |
| 18 | OD41711/2025-2026:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges |
| 19 | OD41709/2025-2026:Supply of MS Bolts and nuts. |
| 20 | OD41710/2025-2026:Fabrication of Structural steel canal shutters (up to 2 ton weight) and accessories etc. as per approved specifications or drawings and directions of deptl officer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied. |
| 21 | 85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site |
| 22 | Supply, fabrication and painting of hoisting structure. |
| 23 | OD41715/2025-2026:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges |
| 24 | OD41714/2025-2026:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges |
| 25 | OD41716/2025-2026:Supply of MS round bar including cost of conveyance charges |
| 26 | OD41713/2025-2026:Fabrication of Structural steel Hoisting platform and accessories etc. as per approved specifications or drawings and directions of deptl officer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied. |
| 27 | 85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site |
| 28 | Supply and fixing of new hoisting mechanism, screw rods, new rubber seals, etc and erection of shutter, hoisting structure etc and conducting trial run |
| 29 | OD41701/2025-2026:Providing base and nut arrangement for hoisting the shutter including cost of all materials labour etc. |
| 30 | OD41697/2025-2026:Providing EN-8 screw rod with one number of EN-8 screw shaft, hand operation including cost of all materials, labour, hire charges and conveyance. |
| 31 | OD41695/2025-2026:Conveying manually (distance min 50m & up to max 200m) the fabricated shutter (Wt of shutter less than 1 ton) and other materials from road side to site. |
| 32 | OD41696/2025-2026:Erection of the Shutter and Hoisting Platform including safely placing shutter in grooves, alignment correction, setting, fixing etc complete including cost of all labour, machinery, incidental and conveyance , lead and lift charges etc. complete as per direction of departmental officer at site. |
| 33 | OD41699/2025-2026:Supplying and fixing in correct position with specified initial interface L-type/Bulb nose rubber seal confirming to IS11855 to the canal shutters including cost of MS bolts & Nuts, all labour, machinery, incidental and conveyance charges complete as per approved specification or drawing. |
| 34 | OD41698/2025-2026:Supplying and fixing in correct position with specified initial interface the flat type rubber seal confirming to IS 11855 to the canal gates including cost of MS bolts and nuts, all labour and machinery and incidental and conveyance charges complete as per approved specification or drawing. |
| 35 | OD41700/2025-2026:Trial run of the new shutter with its hoisting mechanism and applying grease on screw rod including cost of labour, all lead and lift etc complete as per the direction of deptl officer at site. Please Enable Macros to View BoQ information |