|
| 1 | cutting tree branches |
| 2 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. |
| 3 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete |
| 4 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. |
| 5 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved |
| 6 | OD243074/2023-2024: Engaging labours for clearing sunshades, roof top,plumbers etc., all incidental charges etc complete. |
| 7 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 8 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth |
| 9 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth |
| 10 | OD243075/2023-2024:Removing blocks from sewer manhole of size 80cmx80cm and depth upto 100cm (filled with solid waste from closet line) and clearing the dirty materials into suitable excavated pits to a safe distance place including charges for bamboo splits for clearing block from manhole to main hole connecting line, hire charges for rope buckets and all labour charges and all incidental charges etc. complete, as per the direction of departmental officers at sit |
| 11 | OD243076/2023-2024:Removing RCC covering slab of septic tank and checking for any blockages, removing dirty and blocked matters and replace the covering slab etc. Please Enable Macros to View BoQ information |