| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : including all leads, lift and carriage complete |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge (All kinds of soil) |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiralstair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Reinforcement for RCC work including straightening , cutting, bending, placing in position and binding all complete |
| 8 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) |
| 9 | 20 mm cement plaster of mix 1 : 6 MIX finished with floating coat of cement mix. |
| 10 | Centring and shuttering including strutting propping etc and removal of formwork for: foundation footings,bases of columns etc for mass concrete. |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form work for : Suspended floors, roofs, landings, balconies and access platforms. |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form work for:Edges of slabs and breaks in floors and walls under 20 cm |
| 13 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 15 mm dia. nominal bore Medium |
| 14 | Construction of CIB (includes concrete Pedestrial/Brick 3*2, Plastering,Painting complete job as per direction of Engineer in charge |
| 15 | Carriage of cement from an avg. distance of 10 K.M by MT & 800 M by AT |
| 16 | Carriage of sand from an avg. distance of 25 K.M by MT & 800 Meter by AT |
| 17 | Carriage of aggregates below 40 mm from an avg. distance of 25 KM by MT & 800 Meter by AT |
| 18 | Carriage of Bricks from an avg. distance of 170 K.M by MT & 800 M by AT Please Enable Macros to View BoQ information |