|
| 1 | Providing & fIXING New Submersible 12.5 BHP Motor |
| 2 | Control Panel Board (12.5BHP of sub Motor). |
| 3 | Providing and laying, jointing, fixing, testing ISI Marked G.I. Pipe (as per IS 1239) B Class, including cost of Specials such as tees, bends, sockets elbow etc., cutting, threading and testing in trenches in the ground complete Column Pipe (G.I) 80mm i/d |
| 4 | Supplying,fixingandtestingat siteAutomatic electronic typewater level indicationsystem with gunmetal float sensor and electrical cable suitable for three phase pump submersible / monoblock to be fixed on existing panel for OHSRs complete in all respects. |
| 5 | Disinfection unit providing installing, testing & commissioning one no. electrically actuated diaphragm operated metering system, chemical dosing chlorinator, suitable for delivery 0.5-6 lt of sodium hypochlorite per Hr under max delivery pressure upto 7 Kg/cm2 & suction lift not less than 1.5 |
| 6 | Removing of leakages 90mm pipe line. (PVC) Dism & Restroation Cement Concrete. |
| 7 | Removing of leakages 110mm pipe line.(PVC) Dism & Restroation Cement Concrete. |
| 8 | Providing, laying, Fixing, jointing, cutting & testing of uPVC Pipes & Specials (6 kg./cm2) including cost of excavation complete in all respects as per ISI-4985 standard analysis uPVC Pipe 90 mm o/d (Manually) |
| 9 | Dismantling & restoration of Brick, complete in all respect 90 mm pipe O/d |
| 10 | Dismantling of Interlock Tile, Brick restoration only Interlock complete in all respect 90 mm pipe O/d |
| 11 | Providing&fixingC.I/D.I Flangedend, stem of SS (AIS 1410) and Bronze(gunmetal) working parts Sluice Valves ISI marked 14846-2000, includingjointing, testing&cost of Nut ,Bolt & insertion sheet, all carriage complete (with theapproval of Engineer incharge) 150mm i/d Sluice Valves flanged |
| 12 | Providing&fixingC.I/D.I Flangedend, stem of SS (AIS 1410) and Bronze(gunmetal) working parts Sluice Valves ISI marked 14846-2000, includingjointing, testing&cost of Nut ,Bolt & insertion sheet, all carriage complete (with theapproval of Engineer incharge) 100mm i/d Sluice Valves flanged |
| 13 | Construction of masonry sluice valve chamber ending Sluice valve cover as per standard design & drawings of public health department of Size 0.9m x 0.9m |
| 14 | House Hold Water Connection Providing proposed water connection to house hold up to wall with providing, laying jointing, testing MDPE pipe lines 15mm i/d=4.50 mtr, including cost of specials such as tees, bends, sockets, elbow etc. cutting, threading, and testing in trenches in the ground and ISI marked 15mm i/d GM ferrule as per IS: 2692 and 3\\" i/d clamp with c.i bib cock 15mm i/d as per IS:210 with stainless steel spindle of approved make as per CSR 30.65(b) complete. |
| 15 | Repair of Expension Joint 150 mm |
| 16 | Hand boring Horizontly for crossing of pipe under road or any other obstacle by using Auger/Bocki method.Including excavation , stringing and jointing of pipe upto 160mm complete |
| 17 | Repair of Pump Chamber, White Wash, Electric wirring, Fan and light (Size 3.70 x 4.30), etc Complete in all respect Analysis Attached. |
| 18 | P/F of OHSR Jali |
| 19 | P/F of OHSR Manhole Cover |
| 20 | Supplying & Fixing of well cap having thread to fix on housing pipe complete in all respect. 250mm internal diameter |
| 21 | ConstructionofGravelPit outside the Pump Chamber. (0.90m Dia.) as per standard design & drawings of public health department. Please Enable Macros to View BoQ information |