| 1 | Manning & Fuelling of Dept. Van Monthly charges for providing :- |
| 2 | Skilled Operator: (Diploma/ITI) for testing,. Commercial Driver: For Dept. Vehicle,Diesel for vehicle movement within Circle & Safekeeping & Cleaning of Van.(Availability: 24x7) |
| 3 | VARIABLE EXECUTION CHARGES (LABOR) 33 KV Cable Fault (Labor) :- |
| 4 | Assistance Basis: Rectification of 33KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, backfilling & levelling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning. |
| 5 | Assistance Basis: Replacement of 33KV Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier’s jointer, including manual support during cable preparation (straightening/holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal |
| 6 | Full Execution Basis: Rectification of 33 KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is NOT in the scope of the Supplier Firm. The work includes excavation, barricading, and providing a experienced cable Jointer for the installation of Straight-Through Joint (STJ). The work includes cable preparation, laying of additional cable (if required), High Voltage testing, backfilling, and road restoration. The Contractor shall also provide all necessary Tools & Plants (T&P) ,consumables, and skilled labor required for the execution of the work |
| 7 | Full Execution Basis: Replacement of 33KV Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is NOT in the scope of the Supplier Firm. The work includes safe dismantling of the old termination, cleaning of cable box/bushings, and providing an experienced Jointer for the installation of the store-issued kit. Scope covers cable preparation, connection to busbar/line, re-sealing, and site cleaning. The Contractor shall provide all necessary Tools & Plants (T&P), consumables, and skilled labor required for the execution. |
| 8 | VARIABLE EXECUTION CHARGES (LABOR) 11 KV Cable Fault (Labor) :- |
| 9 | Assistance Basis: Rectification of 11KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, backfilling & levelling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning. |
| 10 | Assistance Basis: Replacement of 11KV Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier’s jointer, including manual support during cable preparation (straightening/holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal |
| 11 | Full Execution Basis: Rectification of 11 KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is NOT in the scope of the Supplier Firm. The work includes excavation, barricading, and providing a experienced cable Jointer for the installation of Straight-Through Joint (STJ). The work includes cable preparation, laying of additional cable (if required), High Voltage testing, backfilling, and road restoration. The Contractor shall also provide all necessary Tools & Plants (T&P) ,consumables, and skilled labor required for the execution of the work. |
| 12 | Full Execution Basis: Replacement of 11KV Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is NOT in the scope of the Supplier Firm. The work includes safe dismantling of the old termination, cleaning of cable box/bushings, and providing an experienced Jointer for the installation of the store-issued kit. Scope covers cable preparation, connection to busbar/line, re-sealing, and site cleaning. The Contractor shall provide all necessary Tools & Plants (T&P), consumables, and skilled labor required for the execution. |
| 13 | VARIABLE EXECUTION CHARGES (LABOR) LT Cable Fault (Labor) :- |
| 14 | Assistance Basis: Rectification of LT UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, backfilling & levelling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning. |
| 15 | Assistance Basis: Replacement of LT Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier’s jointer, including manual support during cable preparation (straightening/holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal |
| 16 | Full Execution Basis: Rectification of LT UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is NOT in the scope of the Supplier Firm. The work includes excavation, barricading, and providing a experienced cable Jointer for the installation of Straight-Through Joint (STJ). The work includes cable preparation, laying of additional cable (if required), High Voltage testing, backfilling, and road restoration. The Contractor shall also provide all necessary Tools & Plants (T&P) ,consumables, and skilled labor required for the execution of the work |
| 17 | Full Execution Basis: Replacement of LT Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is NOT in the scope of the Supplier Firm. The work includes safe dismantling of the old termination, cleaning of cable box/bushings, and providing an experienced Jointer for the installation of the store-issued kit. Scope covers cable preparation, connection to busbar/line, re-sealing, and site cleaning. The Contractor shall provide all necessary Tools & Plants (T&P), consumables, and skilled labor required for the execution. |
| 18 | Attending to Underground (UG) Consumer Service Cable fault. Scope includes excavation to expose the faulty joint, repairing and sealing the cable using HT Tape, and backfilling/leveling the road to its original condition. The rate is inclusive of all labor, materials (including HT tape), Tools & Plants (T&P), and consumables required for the completion of work. |
| 19 | Single Phase Connection |
| 20 | Three Phase Connection |
| 21 | Supply of 11 kV Heat Shrinkable type Cable Termination Kits XLPE Cable Confirming to VDE-0278/1EEE-48-1975/IS-13573-1992 and ESI STD.09-13 and all other relevant standards complete with all accessories for the following type & size: |
| 22 | Outdoor size 3X185 sq mm |
| 23 | Indoor size 3X185 sq mm |
| 24 | Straight through size 3X185 sq mm |
| 25 | Supply of 33 kV Heat Shrinkablw type Cable Termination Kits XLPE Cable Confirming to VDE-0278/1EEE-48-1975/IS-13573-1992 and ESI STD.09-13 and all other relevant standards complete with all accessories for the following type & size: |
| 26 | Outdoor/Indoor size 3X300 sq mm |
| 27 | Straight through size 3X300 sq mm |
| 28 | Fuel Charges |
| 29 | Outstation Charges Please Enable Macros to View BoQ information |