| 1 | Vented cause way |
| 2 | Earth work in excavation of hard soil within initial lead and lift for foundation including rough dressing and levelling the bed etc. complete. |
| 3 | Sand filling in foundation & Plinth including watering and well ramming etc. complete. |
| 4 | Cement Concrete (1:3:6) using 40 mm size Cbg metal including all cost, conveyance, royalty etc. complete. |
| 5 | Cement concrete (1:2:4) using 12 mm size cbg chips including all cost, conveyance & royalty etc complete |
| 6 | Rigid and smooth centering and shuttering for RCC works and dismetaling then after casting etc. complete. |
| 7 | Foundation & Plinth |
| 8 | Paver block with RCC drain |
| 9 | Earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed and depositing the excavated earth at places away from site with all leads and lifts including royalties, cost of all labour, T&P required for the work as direction of the Engineer-in-Charge. |
| 10 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts & delifts including trimming of slopes and bed to design section 7 depositing the excavated materials away from work site as per the specification and as directed by the Engineer-In-Charge within the initial lead of 1 Km from the place of excavation complete |
| 11 | Cement concrete of proportion (1:3:6) in foundation and floor using 40mm size hard black hand broken granite metal of approved quality and from approved quarry including hosting, lowering and laying in layers not exceeding 15cm (6\\") thick to the required level, ramming, watering and curing etc. complete including cost, conveyence, royalties and taxes of all materials and all labour with T&P required for the work etc complete. |
| 12 | Providing, laying, spreading and compacting graded stone aggregates to WMM specification as per Clause 406 of MoSRT&H Specification for Road & Bridge works. |
| 13 | Providing and Filling in foundation plinth with sand in layer not exceeding 23.5cm (9\\") thick including watering and ramming with cost, conveyence, royalties and taxes of sand and all labour with T&P required for the work etc complete. |
| 14 | Cement Concrete (1:2:4) using 12mm size cbg chips including all cost, conveyance & royalty etc. complete. |
| 15 | RCC M20 grade (1:½:3) using 20 mm and down graded black hbg chips including all cost, conveyance & royalty etc. complete. |
| 16 | Supplying and straightening bent up or coiled \\"Tor Rods\\" cutting, bending, crakning, hooking, welding or jointing (if required) the tor steel Rods and binding, tying the grills, hosting and placing in position as required for the RCC works including cost, conveyance and taxes of tor steel rods and binding wire of 18 to 20 gauge and labour with T&P required for the works etc complete in all respect ( weight of binding wires will not be considered and measurement of tor steel rod will only be considered for payment) |
| 17 | Rigid and smooth centering & shuttering for RCC works and dismetaling them after casting including all cost, conveyance, royalty etc. complete. (Pever block) |
| 18 | Providing and Laying Factory made Chamfered edge Cement Concrete Paver Blocks of required strength, thickness & size/shape made by table Vibratory method to attain superior smooth finish using PU or Equivalent moulds, Laid in required gray colour and Pattern over S0mm thick Compacted bed of coarse sand , compacting and proper embedding / laying of interlocking Paver Blocks into the sand bedding layer thro ugh vibratory compaction by using plate vibrator, Filling joints with Fine sand and cutting of Paver blocks as per required size/ Pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways, or light traffic parking and Lanes/Road etc, all complete as per Manufactures Specifications and Direction of Engg-In- Charge. 80mm thick C.C. Paver Blocks of M-40 grade with approved colour design Pattern etc. complete. |
| 19 | Wall Please Enable Macros to View BoQ information |