|
| 1 | Construction of 30000 Liters OHT @ Adidravidar Kudiyiruppu in Alathur panchayat |
| 2 | Earth work excavation and depositing on bank with intial lead and lift in all clasuses of soil such as Hard Gravely soil, Gravely soil except Hard Rock requiring Blasting etc complete as per SS20B for narrow foundation |
| 3 | Second Depth from 2 . 0 m - 4 . 0 m below GL |
| 4 | Filling in the foundation with filling M Sand including cost and conveyance to the site and all labour charges for filling as per standard specifications |
| 5 | Cement Concrete 1:4:8 mix using 40mm ISS HBG stone jelly and M Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specifica |
| 6 | Reinforced cement concrete in 1 : 1.5 : 3 , mix using 20mm iss HBG stone jelly and M SAND for all reinforced cement concrete works excluding cost of centering and stell but including laying,vibrating,curing and finishing ,fixing fan clamps in the RCC flo |
| 7 | Below GL from 1.50 m - 4.50 m |
| 8 | Below 1.50m from GL |
| 9 | 0.0m to 4.50 m above GL |
| 10 | 4.50 m to 7.32 above GL |
| 11 | 7.32 M TO 10.98M above GL |
| 12 | 10.98 M TO 14.64 M above GL |
| 13 | 14.64M TO 18.30M above |
| 14 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, |
| 15 | From 0 m to 3.30 m above GL |
| 16 | From 3.31 m to 4.30 m above GL |
| 17 | From 6.31 m to 7.30 m above GL |
| 18 | From 8.30m to 9.30m above GL |
| 19 | From 9.31 m to 10.30 m |
| 20 | Curved surface Upto 3.30 m |
| 21 | Square columnBelow GL |
| 22 | From 0m to 3.30 M |
| 23 | From 3.31m to 4.30 M |
| 24 | From 4.31m to 5.30 M |
| 25 | From 5.31m to 6.30 M |
| 26 | From 6.31m to 7.30 M |
| 27 | From 7.31m to 8.30 M |
| 28 | From 8.31m to 9.30 M |
| 29 | From 9.31m to 10.30 M |
| 30 | From 10.31m to 11.30 M |
| 31 | From 11.31m to 11.45 M |
| 32 | Supplying, Fabricatung and placin g in position of RTS or MS rod for all reinforced cement concrete works as per design given including cost of steel and binding wire in all floors etc,complete complying with standard specification |
| 33 | Painting Two Coats with approved Cement Paint over the Plastered surface over one coat of Whie Cement including cost of all materials and labour charges etc complete |
| 34 | Fabrication,Supply,delivery and fixing of Out side MS Lader of 45 cm clear wide made out of 50 mm x 50 mm x 6mm MS Angle for both sides and for steps at 30 cm c / c welded jointed etc., for I staging from GL to FIRST Brace ( weight 4.50 kg/m ) Second and |
| 35 | Providing and fixing of R C C inner acess ladder in R C C 1:1.5:3 USING 20MM hbg stone for OHT including cost of reinforcement , placing grill in position, centering shuttering , mixing concrete curing etc., |
| 36 | Providing Ventilating arrangements mosquito proof nylon net as directed by dept officer |
| 37 | Providing Cut stone slab in CM AC Vent cowl arrangements mosquito proof nylon net as directed by dept office |
| 38 | Providing Man hole Cover of size 0.60m x0.60m in Rc c 1:1.5:3 with suitable Reinforcement and 50 x50x6mm MS angle fixed along edges and as directed by dept officer |
| 39 | 65 mm GI Pipe Inlet |
| 40 | 63mm dia GM gate valve |
| 41 | 65mm dia GI Tee |
| 42 | 63mm dia GI Coupling |
| 43 | 63mm dia GI Bend |
| 44 | 90mm dia Tcoupler etc., |
| 45 | 80x65mm dia GI Reducer |
| 46 | 65mm dia GI Flonge set |
| 47 | Labour charges for GI Pipe connection to the OHT , for inlet, out let ,overflow pipe and scour arrangements including cutting and threading , earth work excavation & refilling |
| 48 | Re-filling with excavated soil compplying with standard specification in layers of 15cm thick well rammed and consolidated after pipes and specials are laid and tested |
| 49 | Construction of Platform etc., |
| 50 | Cost for Name board etc., |
| 51 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |