|
| 1 | Visit Charges to attend Servicing/ Repairing of Chlorinators Monthly including charges of technical person, to & fro, lodging etc. complete |
| 2 | Supply, Installation and testing of Vacuum Regulator including all required material, labour, tools and plants etc complete. |
| 3 | Supply, Installation and testing of \\"O\\" ring and washer for monitor including all required material, labour, tools and plants etc complete. |
| 4 | Supply, Installation and testing of inlet valve assembly for regulator including all required material, labour, tools and plants etc complete. |
| 5 | Supply, Installation and testing of gas flow meter Cap.20 Kg/hr. including all required material, labour, tools and plants etc complete. |
| 6 | Supply, Installation and testing Non return valve for vacuum line including all required material, labour, tools and plants etc complete. |
| 7 | Supply, Installation and testing Control valve assembly including all required material, labour, tools and plants etc complete. |
| 8 | Supply, Installation and testing of control valve set including all required material, labour, tools and plants etc complete. |
| 9 | Supply, Installation and testing of vacuum gauge with PVC Isolator4\\" Dial BCPM including all required material, labour, tools and plants etc complete. |
| 10 | Supply, Installation and testing of water gauge 4\\" dial BCMP including all required material, labour, tools and plants etc complete. |
| 11 | Supply, Installation and testing of 3/8\\" OD X 16 SWG Copper coil with end fittings including all required material, labour, tools and plants etc complete. |
| 12 | Supply, Installation and testing of Injector nozzle including all required material, labour, tools and plants etc complete. |
| 13 | Supply, Installation and testing of Injector diaphragm set including all required material, labour, tools and plants etc complete. |
| 14 | Supply, Installation and testing of Injector NRV Set including all required material, labour, tools and plants etc complete. |
| 15 | Supply, Installation and testing of diaphragm for differential regulator including all required material, labour, tools and plants etc complete. |
| 16 | Supply, Installation and testing of 50 MM PP Ball valve for solution line including all required material, labour, tools and plants etc complete. |
| 17 | Supply, Installation and testing of rigid PVC NRV for vacuum line including all required material, labour, tools and plants etc complete. |
| 18 | Supply, Installation and testing of Carbon Steel header including all required material, labour, tools and plants etc complete. |
| 19 | Supply, Installation and testing of Header isolation valve(IS3224) including all required material, labour, tools and plants etc complete. |
| 20 | Supply, Installation and testing of yoke clamp(Tonner clamp) including all required material, labour, tools and plants etc complete. |
| 21 | Supply of Lead washers |
| 22 | Repairs of monoblock pump set of 3 HP including dismantling of motor, rewinding of motor, replacement of bearing and bushes, labour, tools and plants etc complete. |
| 23 | Repairs of weighing machine display unit and sensors including all required material, labour, tools and plants etc complete. |
| 24 | Supplying, installation and commissioning of safety shower along with eye wash nozzles and body wash shower near caustic storage tank |
| 25 | Visit Charges to attend Servicing/ Repairing of Chlorinators Monthly including charges of technical person, to and fro, lodging charges etc complete |
| 26 | Supply, Installation and testing of Vacuum Regulator including all required material, labour, tools and plants etc complete. |
| 27 | Supply, Installation and testing of \\"O\\" ring and washer for monitor including all required material, labour, tools and plants etc complete. |
| 28 | Supply, Installation and testing of inlet valve assembly for regulator including all required material, labour, tools and plants etc complete. |
| 29 | Supply, Installation and testing of gas flow meter Cap.5 Kg/hr. including all required material, labour, tools and plants etc complete. |
| 30 | Supply, Installation and testing Non return valve for vacuum line including all required material, labour, tools and plants etc complete. |
| 31 | Supply, Installation and testing Control valve assembly including all required material, labour, tools and plants etc complete. |
| 32 | Supply, Installation and testing of control valve set including all required material, labour, tools and plants etc complete. |
| 33 | Supply, Installation and testing of vacuum gauge with PVC Isolator4\\" Dial BCPM including all required material, labour, tools and plants etc complete. |
| 34 | Supply, Installation and testing of water gauge 4\\" dial BCMP including all required material, labour, tools and plants etc complete. |
| 35 | Supply, Installation and testing of 3/8\\" OD X 16 SWG Copper coil with end fittings including all required material, labour, tools and plants etc complete. |
| 36 | Supply, Installation and testing of Injector nozzle including all required material, labour, tools and plants etc complete. |
| 37 | Supply, Installation and testing of Injector diaphragm set including all required material, labour, tools and plants etc complete. |
| 38 | Supply, Installation and testing of Injector NRV Set including all required material, labour, tools and plants etc complete. |
| 39 | Supply, Installation and testing of diaphragm for differential regulator including all required material, labour, tools and plants etc complete. |
| 40 | Supply, Installation and testing of 50 MM PP Ball valve for solution line including all required material, labour, tools and plants etc complete. |
| 41 | Supply, Installation and testing of rigid PVC NRV for vacuum line including all required material, labour, tools and plants etc complete. |
| 42 | Supply, Installation and testing of Carbon Steel header including all required material, labour, tools and plants etc complete. |
| 43 | Supply, Installation and testing of Header isolation valve(IS3224) including all required material, labour, tools and plants etc complete. |
| 44 | Supply, Installation and testing of yoke clamp(Tonner clamp) including all required material, labour, tools and plants etc complete. |
| 45 | Supply of Lead washers |
| 46 | Repairing of Vertical multistage pump set of 3 HP including dismantling of pump, rewinding of motor, replacement of bearings, labour, tools and plants etc . complete |
| 47 | Repairs of weighing machine display unit and sensors including all required material, labour, tools and plants etc. complete |
| 48 | AMC for Chlorine leak absorption system for a period of one year which includes. (During the monthly visit complete check-up shall be carried out of all the items and trail run shall be taken on auto as well as manual operation mode.) |
| 49 | Providing and replacement of All the nut / bolts / washers and Gaskets of all flange joints including all required material, labour, tools and plants |
| 50 | Providing and maintaining of Concentration of Caustic solution after checking once in a year, and the necessary arrangement shall be done to maintain the concentration level at 20%. |
| 51 | Maintaining of The PP circulation pump, motor for PP pump and motor for blower and are covered 100% and shall be replaced if the same are found not be performing up to the mark including all required material, labour, tools and plants |
| 52 | Maintenance of Control panel necessary repairs and replacing of failed components as and when required including all required material, labour, tools and plants |
| 53 | Providing and replacement of All valves including all required material, labour, tools and plants |
| 54 | Maintaining of Caustic solution tank, absorption tower, blower Impeller for minor leakages at WTP Sakegaon and at GSR, Jalgaon |
| 55 | Providing and Painting of Caustic solution tank, Tonner hood, Blower and chemical pump base plate and platform including all required material, labour, tools and plants |
| 56 | AMC for Chlorine leak absorption system for a period of one year which includes. (During the monthly visit complete check-up shall be carried out of all the items and trail run shall be taken on auto as well as manual operation mode.) |
| 57 | Providing and replacement of All the nut / bolts / washers and Gaskets of all flange joints including all required material, labour, tools and plants |
| 58 | Providing and maintaining of Concentration of Caustic solution after checking once in a year, and the necessary arrangement shall be done to maintain the concentration level at 20%. |
| 59 | Maintaining of The PP circulation pump, motor for PP pump and motor for blower and are covered 100% and shall be replaced if the same are found not be performing up to the mark. |
| 60 | Maintenance of Control panel necessary repairs and replacing of failed components as and when required including all required material, labour, tools and plants |
| 61 | Providing and replacement of All valves including all required material, labour, tools and plants |
| 62 | Maintaining of Caustic solution tank, absorption tower, blower Impeller for minor leakages at WTP Sakegaon and at GSR, Jalgaon |
| 63 | Providing and Painting of Caustic solution tank, Tonner hood, Blower and chemical pump base plate and platform including all required material, labour, tools and plants Please Enable Macros to View BoQ information |