| 1 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil. |
| 2 | Supplying and stacking good earth at site of work.Note: 1) Loading, unloading and carriage to be paid extra as peractual lead. 2) Earth measured in stacks will be reduced by 20% foe payment |
| 3 | Carriage of Materials by mechanical transport including loading,unloading and stacking : 10 km |
| 4 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 5 | Providing and laying un-reinforced, dowel jointed, plain cement concrete mix With Concrete Mixer & vibrator pavement over aprepared sub base with 43 grade cement , coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed as per approved mix design, laid,spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures (if required) as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. PCC M-20 |
| 6 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 7 | Extra for random rubble masonry with hard stone in superstructureabove plinth level and upto two stories. |
| 8 | Extra for coursed rubble masonry with hard stone (first or secondsort) in superstructure above plinth level and upto two stories. |
| 9 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix :1:4 (1 cement : 4 fine/ coarse sand) |
| 10 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded 20mm nominal size stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. 75mm thick |
| 11 | Stone slab roofing on ground floor with fine grained stone slab90mm average thickness from approved quarry including filling ofjoints slab in cement sand mortar 1:4 with ceiling pointing in cementsand mortar 1 : 3 complete as per specification for span: Above 2.50 metre and up to 3.00 metre |
| 12 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,having thermal stability for hot & cold water supply including allCPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in-charge. 20 mm nominal outer dia .Pipes. |
| 13 | Supplying and fixing Soorsagar Bhura or Equivalent ashlarsills, lintels and dassa, bearing, bed & top surface madeperfenctly even, jambs, skirting steps etc. rough dressed: Upto 15 cm. thick |
| 14 | Supply and fixing Jodhpur sand stone Machine cut Dash,Coping,sill,lintel fixed in cement sand mortar 1:4. 9 cm (3.5\\") thick |
| 15 | Supply and fixing Jodhpur sand stone Machine cut Kerb stone(10cm wide 40 cm. height) fixed in white cement sand mortar1:4 with pigment including EarthWork. |
| 16 | Providing and fixing precast cement concrete M-20 grade (Using mechanical Concrete Mixer) kerb stone top and bottom width 115 and 165 mm respectively, 250 mm high on 150 mm thick PCC M-10 grade foundation as per design, including fixing at site as per clause 408 of MoRT&H Specification including all material, labour, machinery, lighting, guarding and maintenance of diversion |
| 17 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) :Raised and cut pointing |
| 18 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm). |
| 19 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates andsimilar works |
| 20 | Painting with synthetic enamel paint of approved brand andmanufacture to give an even shade :32.50.1 Two or more coats on new work |
| 21 | Providing and fixing of 60mm thick precast cement concrete interlocking paver block casted with rubber moulds in approved reflective colour and design having minimum compressive strength of 300 kg/ sq cm. The CC paving blocks be laid on average 50mm thick bed of coarse sand and the joint is to be filled with fine sand. Laying procedure on compacted sub-base as defined. Complete job is to be executed as per the instruction of Engineer in-charge. The rates to be inclusive of all lead & Lifts etc. complete as per specifications |
| 22 | Making lawns including ploughing and breaking of clod, removal of rubbish, dressing and supplying doobs grass roots and planting at 15 cm apart, including supplying and spreading of farm yardmanure at rate of 0.18 cum per 100 sqm. |
| 23 | Maintenance of lawns or Turfing of slopes (rough grassing) for aperiod of one year including watering etc. |
| 24 | Planting permanent hedges including digging of trenches, 60 cmwide and 45 cm deep, refilling the excavated earth mixed withfarmyard manure, supplied at the rate of 4.65 cum per 100 metresand supplying and planting hedge plants at 30 cm apart. |
| 25 | Maintenance of Hedge for one year |
| 26 | Digging holes in all kinds of soil and refilling the same with theexcavated earth mixed with well decayed farm yard manure (cost of well decayed farm yard manure to be paid separately). Hole 0.6 m dia and 0.6 m deep |
| 27 | Supply and planting following species best quality container grownhealthy trees of 2 mt. min. height, well established & free fromdisease at site in 0.90 m dia holes, 1 m deep dug in the ground,mixing the soil with decayed farm yard/sludge manure, backfillingthe hole watering etc as required.Plumeria alba ( Champa) |
| 28 | Gulmohar(Delonix regia) |
| 29 | Neem(Azadirachta indica) |
| 30 | Providing and fixing C.P. brass bib cock of approved qualityconforming to IS:8931 15 mm nominal bore |
| 31 | Providing and fixing ball valve (brass) of approved quality, High orlow pressure, with plastic floats complete : 15 mm nominal bore |
| 32 | Supplying, erecting and fixing in position specified precast RCCbench made of RCC grade M-30 consisting of 2 Nos. “L” shapedbase support of thickness 100 mm back height 1000mm, front height 450 mm, base width 420mm and 5 Nos. RCC planks of size of 1500x100 x 50 mm and 1 Nos RCC planks of 150x200x50mmincluding joining all parts with galvanised nuts and bolts of suitablesize. All bolts to be sealed after assembly with nice finish andappearance and level complete in all respect as per direction ofengineer in-charge. Every bench should have a manufacturer’s logo of appropriate size Engraved at suitable place. Please Enable Macros to View BoQ information |