| 1 | Earthwork Excavation in all soils and sub soils except Hard Rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick Watering, Ramming, Depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. |
| 2 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers |
| 3 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 |
| 4 | a)For Drain Side Wall |
| 5 | b)Chamber side wall & slab (With Shuttering) |
| 6 | Plain Cement Concrete 1:2:4 (one cement, two M Sand and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification |
| 7 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - |
| 8 | Supplying Fabricating and placing in position of RTS Steel Rods for reinforcement including the cost of steel and binding wire etc., complete and as directed by Departmental officers.etc.,complete. |
| 9 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. |
| 10 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 11 | Plastering with cement mortar 1:3 mix (One cement and three sand) to 20mm thick mixing with leak proof compound including all labour charges cost and conveyance of all materials to site etc., complete as per standard specification |
| 12 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. |
| 13 | Supply, delivery of Crompton 7.5 HP Three Phase Sewage Submersible Pump 2 to 22 meters ( 7 to 72 feet) head 720 to 50 LPM flow rate Motor including pre delivery inspection charges, packing, loading, transportation, unloading, stacking, transit insurance and other contingencies etc., complete. (Local Rate) |
| 14 | Supply and fixing of 3 phase 7.50 HP panel board with starter, MCB single phase, preventor, capacitor, volt meter, Ammeter etc., complete as per standard specification.(SOR-WD-M1915) |
| 15 | Supplying of 3 core flat submersible cable with copper multi stand conducted with ISI mark should be delivered of 4sqmm flat submersible cable inluding packing, loading, transporation, unloading, stacking, tranist insurance etc., complete. (SOR-WD-M1975) |
| 16 | Supply and fixng of TNEB meter board suitable for 3 phase 63A service connection made up of suitable angle iron frame work of size 2 feet x 1-1/2 feet using angle iron of size 1-1/2\\" x 1-1/2\\" x 1/4\\" rigidly fixed on wall covered with hylem sheet of size 2 feet x 1/2 feet of 6mm thickness with necessary bolts and nuts supports and supply and fixing of 3 Nos. 63A fuse units (500V), 1 No. neutral link, copper earth flat of size 1\\" x 1/4\\" with inter connection of EB meter to fuse units by 16 Sq.mm PVC insulated copper wire with 1 No 63 Amp 30 MA Four Pole RCD / RCCB (Higher End) with suitable necessary connection with earth connection complete (SD131) |
| 17 | Supply and run of 4 of 6 Sq.mm. Polythene insulated and PVC sheathed (Heavy Duty) SC Cu cable of 1100 V grade on 7/20 bearer wire for service connection mains. Etc complete as per standard specification (SD-68) |
| 18 | Supply and run of 4 of 6 Sq.mm. Polythene insulated and PVC sheathed (Heavy Duty) SC Cu cable of 1100 V grade in suitable 25mm GI pipe(\\"B\\" class) suitably bent at both ends with necessary angle iron upright and supports for mains. (SD 71) |
| 19 | Supply and delivery of PVC Pipe Pipes Specials approuved quality of departmental officers loading, unloading, Frieght and transit insurance etc., Cost and conveyance of all materials to Site etc., Complete. |
| 20 | 90mm PVC Pipe (SOR-WD-M0021) |
| 21 | 90mm PVC Bend (SOR-D-M0112 ) |
| 22 | 110mm HDPE Pipe (SOR-WD-M0022) |
| 23 | Laying and Jointing of HDPE Pipe with ISI Specification including cost of conveyance of all materials and labour charges etc. Complete (SOR-WD-W0425) |
| 24 | Refilling of Excavted earth in Pipeline strench including cost of conveyance of all materials and labour charges etc. Complete. Please Enable Macros to View BoQ information |