| 1 | RAIN WATER HARVESTING TANK |
| 2 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 3 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 4 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 5 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 6 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 7 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts |
| 8 | OD484136/2025-2026:supplying and winding with 1 layer of 10 guage, 50mmX50mm welded mesh over the steel cage including material and labour(Details of cost for 1m2 |
| 9 | OD484138/2025-2026: Supplying and winding with three layers of 24 guage, 12.50x12.50 mm GI chicken mesh around the cylinderical steel cage, including material and labour (Details of Coat for 1m2) |
| 10 | OD484137/2025-2026: Supplying and winding with two layers of 24 guage 12.50x12.50 mm GI chicken mesh for wall, dome&filter chamber, including material and labour (Details of Cost for 1 m2) |
| 11 | 13.9.2:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.20 mm cement plaster |
| 12 | 13.9.1:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster |
| 13 | 13.37.1:White washing with lime to give an even shade:New work (three or more coats) |
| 14 | 11.45:Providing and laying 500x500x40 mm thick Turf paver (Turfpave XD) on 150 mm thick sub grade of compacted bed of 20 mm thick nominal size stone aggregate and base course and filling with 150 mm thick jamuna sand, including spreading, well ramming, consolidating and finishing smooth etc. all complete as per direction of Engineer-in-charge. |
| 15 | OD484139/2025-2026:FIRST FLUSH DRAINAGE SYSTEM INCLUDING MATERIAL AND LABOUR |
| 16 | OD484140/2025-2026:PROVIDING FILTER MEDIA(METAL,SAND,&CHARCOL) |
| 17 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 18 | OD490479/2025-2026:Coconut pile-Supplying and stacking well matured coconut post for driving downthrough various strata below bed level including cost conveyance ,labor charges etccomplete. |
| 19 | OD490748/2025-2026:Coconut Pile - Driving down coconut pile to lines and levels through soft to medium clay soilstrata including all hire charges and labour for fixing and all other appliances necessary for piledriving down after pointing the bottom end. Details for one post 6.00m long 15 numbers per90day 6*15=90m details for 90 m length |
| 20 | OD491831/2025-2026:DR PACKING Under foundation - Dry stone packing under foundation with goodquality blasted rubble including conveyance of material and labour charges etc.complete as per direction of departmental officers at site. |
| 21 | 23.5:Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer -in- charges |
| 22 | 50.18.9.7.1:Providing and fixing PVC pipes includings of pipes with one step PVC solvent cement, trenching refilling & testing of joints complete as per direction of Engineer in Charge. 63 mm dia 6Kgf/cm2 |
| 23 | 50.18.9.8.1:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 75 mm dia 6 Kgf/ cm2 Please Enable Macros to View BoQ information |