| 1 | Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge. |
| 2 | Filling in foundatin and plinth with sand watered and rammed including cost of sand & labour |
| 3 | Providing and laying of P.C.C. of 1:3:6 with 4 c.m size hard granite metal in foundation trenches, under floors in line level including curing and ramming etc. all complete as per the direction of the Engineer-in-charge.. |
| 4 | RCC work M20 with 20 mm and down graded size black hard grinite ( crusher broken ) stone chips including hoisting,lowering & laying concrete & compacting by using vibrator watering & curing for 4 weeks including cost & conveyance, royalties & taxes of all materials & labour required for the work etc complete with all T & P in all respect but excluding cost & conveyance of M.S rods & binding wires & tying the grills & placing in proper position. Base |
| 5 | Column |
| 6 | Grade Beam |
| 7 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 8 | Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentin cement mortar (1:6) Foundation & Plinth |
| 9 | Super Structure |
| 10 | 12mm. thick cement plaster (1:6) on brick work |
| 11 | 6 mm thick cement plaster (1:4) to R CC surfaces finished smooth including closed deep chiping and slury treatment |
| 12 | Supplying and fixing of Pre cast kerb stone of size 600mm x 300mm x 150mm ofM-30 grade of approved make, design, colour and size made by Block making machine with proper compaction fixed in required pattern etc. complete in all respect conforming to IS 5758: 1984. |
| 13 | Providing and laying 60mm thick faciory made cement concrete interlocking paver block of M -40 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. |
| 14 | Wall painting 2 coat with Weather Coat paint for Plaster surface out side With water bound cement primer including all cost of etc. complete. As per item no |
| 15 | Fitting and fixing of MS grill approved design with square bar all cost of etc. complete. |
| 16 | Enamel Painting two coats with any approved paint including cost of all labour, materials T & P with taxes, transportation etc all complete including primer. |
| 17 | Providing suppling for all labour with T&P painting /Mural Displaying SBM message and different image drawing on wall surface with weater coat over a coat of primer including cleaning the existing surface. |
| 18 | Removal of excavated earth and dismantling material away from work site to outside by mechanical means to 5K.M. lead of iteam no 1. |
| 19 | Providing & laying Selection no. 1 grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly,as per direction of officer in charge |
| 20 | Planting of Follage Plants(7\\" x8\\" Poly Pack)Digging of pits ,removing all unserviceable materials and dumping outside the working area as shown by the Officer-in-charge,Supply & filling the same pits with good quality of garden soil and well decomposed cow-dung manure mixture of ratio 4:1 and required quantites of fertilizer,pesticides,supply of planting materials with specified saplings,taking up maintenance over 1 month including cost of men,material,tackles all complete. |
| 21 | Planting of Follage Plants(17\\" x18\\" Poly Pack)Digging of pits ,removing all unserviceable materials and dumping outside the working area as shown by the Officer-in-charge,Supply & filling the same pits with good quality of garden soil and well decomposed cow-dung manure mixture of ratio 4:1 and required quantites of fertilizer,pesticides,supply of planting materials with specified saplings,taking up maintenance over 1 month including cost of men,material,tackles all complete. |
| 22 | Fitting and fixing Concrte chair 4 setaed with all cost of labour and materials etc complete with painting |
| 23 | Fitting and fixing of stone Sclpture 4 feet height with Pedestral using Granide tiles upto 3ft. Height |
| 24 | Fitting and fixing of trancparancy board |
| 25 | As per MSBY guideline 3years maintainance @10% Please Enable Macros to View BoQ information |