|
| 1 | Supply, Installation, Testing and Commissioning of Effluent Treatment Plant of capacity 20 KLD for treating the incoming effluent upto specified standards for BOD/COD/TSS & other parameters as per CPCC. The plant is to be skid mounted type having major components as under:- |
| 2 | PRIMARY TREATMENT |
| 3 | Bar ScreenApplication – Screening of Floating matterSize of spacing – 10 mm, MOC- SS304 = 1 No. |
| 4 | Aeration Grid for Effluent Collection tank Application - For providing air in Effluent collection tankCoarse air diffuser. Size : 150mm MOC: Silicon Accessories- Complete with piping & valves MOC – MSEP , “C” Class = 1 No. |
| 5 | Effluent Transfer Pump Application- To pump Effluent for PRIMARY CHEMICAL TREATMENT.Type- Submersible/monoblocCapacity- 5.0 m3/hr., Head- 12 m, MOC – CI = 2 Nos. |
| 6 | Oil SkeemerApplication- To removal of oil from effluent including Pump/Motor of required capacity |
| 7 | SECONDARY TREATMENT |
| 8 | FM/FL with Tube Settler with PlatformCapacity- suitable to handle 20 KLD Agitation with Gear motorFM/FL Gear Motor Ratio-40:1 @ 2 nosMOC – MS with FRP Coating. = 1 No. |
| 9 | Areation Tank (MBBR) with PlatformCapacity: suitable to handle 40 KLDCapacity- 2.5 m3 each reactor + FBMOC – MS with FRP Coating. = 2 Nos. |
| 10 | Media for MBBR REACTOR I & II Sp Surface Area-400 m2/m3 ,MOC- PVC UV Stabilized, Virgin White = 1 lot |
| 11 | Secondary Tube Settler TankCapacity- 3.0 m3. With Hopper BottomMOC – MS with FRP Coating. = 1 lot |
| 12 | Secondary Tube Settler MediaLength - 750mmm MOC - PVC UV Stabilized = 1 lot |
| 13 | Fine Membrane Air Diffusers For Sec-Biological Treatment Reactorcomplete with Piping and valves MOC – Silicon, Tubular = 1 lot |
| 14 | Air Purging Grid For Primary Chemical Treatment, Sec-Biological Treatment Reactor Accessories- Complete with piping & valvesMOC – MSEP “C” Pipe with Fittings = 1 lot |
| 15 | Supply Of Air Blower With AccessoriesApplication - Supply of air for mixingCapacity- 60m3Accessories- MS base plate, safety valves, suction filter, silencer,NRV, PRV, ant vibration pad, V belt, Belt guard, Drive = 2 Nos. |
| 16 | Supply Of Sludge Recycle Pump Type- Centrifugal, horizontal, Self-priming,Capacity- 3.0 m3/hr., Head- 10 m, MOC – CI = 2 Nos. |
| 17 | TERTIARY TREATMENT |
| 18 | Supply of Filter Feed PumpType- Centrifugal, Monobloc, horizontal Capacity- 3.0 m3/hr., Head- 25 m, MOC – CI = 2 Nos. |
| 19 | Supply Of Pressure Sand Filter Media- under bed with graded silica sand MOC – MSEPSize : As per Design Thickness of sheet for Dish 8mm & body 6mm = 1 No. |
| 20 | Supply Of Activated Carbon FilterMedia- under bed with graded silica sand and Activated carbon MOC – MSEPSIZE- Size : As per Design Thickness of sheet for Dish 8mm & body 6mm = 1 No. |
| 21 | Supply Of Hypo SystemDOSING TANK: MOC: HDPE, Capacity 100 liters, Make: Sintex/Ashriwad.DOSING PUMP: Capacity- 0- 10 LPH = 8 Nos. |
| 22 | Interconnecting Pipes, fittings and Valves MOC: MS “ C” CLASS / UPVC 80SCHMAKE: TATA, JINDAL/ ASTRAL = 1 Lot |
| 23 | Ultra Filtration System Capacity 2.0 cum/hrincluding Raw water pumps, Back Wash Pumps, CIP Pumps with tank and Dosing System complete = 1 Job |
| 24 | CONTROL PANELDouble Door Control panel will be fabricated in 14 SWG/ 16 SWG CRCA sheet ,with MCCB/MPCB and other instrumentation like MCCB, MCB, Voltmeter, Ammeter, Selector Switch, Indicator, Push Button, Relay, Terminal block, suitable for independent operation of all the Motors/Pumps complete to the satisfaction of EIC and electrical standards = 1 Job |
| 25 | CablingElectrical Multicore Cable Copper flexible type from Control Panel to all the Motors/Pumps, of ISI marked quality and required size as per the current rating complete to the satisfaction of EIC. = 1 Job |
| 26 | INSTRUMENTATIONPressure Gauges for Air Blowers , PSF & ACF Filters. Level SwitchConnected with Control panel with Collection Tank, filter feed Tank and final Treated water Tank.Flow meter Application: - Inlet line/ Effluent feed line from collection Tank to Anoxic Tank, second with treated water line. = 1 Job |
| 27 | MS base frame, Ladder, Walkways, railings complete with all fittings = 1 Job |
| 28 | Design, drawing and Supervision over civil Works, Flow Diagram, P&ID & Civil Drawings = 1 Job |
| 29 | Warranty:All the major/minor components of the ETP shall be covered under one year warranty in the rates quoted. During this period the agency has to maintain the plant comprehensively without any additional cost. |
| 30 | Supply of Chemicals and Consumables all types required for operation of eTP upto design standard & capacity including Alum, Poly Elecholyte & Sodium Hypo Chloride |
| 31 | Comprehensive maintenance of all major/minor parts including repair/replacement of same free of cost, required for smooth functioning of the ETP upto required capacity and standards |
| 32 | 1st year (covered in waranty period) |
| 33 | 2nd year |
| 34 | 3rd year Please Enable Macros to View BoQ information |